Russell Hill subway accident

Russell Hill subway accident

The Russell Hill subway accident refers to the Toronto Transit Commission subway accident that took place on the Yonge-University Spadina line on August 11, 1995. Three people were killed and 30 were taken into the hospital with injuries when one train rear-ended another train. The subway line was shut down for five days following the collision accident. Investigations found that human error and a design flaw in the mechanical safety devices caused this accident.cite web |url=http://transit.toronto.on.ca/archives/data/200508061136.shtml |title=Ten years after the accident |publisher=TTC |date=2006-11-10 |accessdate=2008-07-19]

Overview

At 6:02 p.m. on Friday, August 11, 1995, a subway train running southbound on the Yonge-University Spadina line ran into the rear of a stationary train halfway between St. Clair West and Dupont stations. There were about 200 to 300 passengers on the two trains, of whom 3 were killed and 30 taken to hospital with injuries; about 100 more filed injury claims against the TTC. Many of the seriously injured were extracted from the twisted remains of the most damaged subway car by rescue workers who worked through the evening under extremely hot and humid conditions. Of the 4 crew members, 3 were taken to hospital with injuries.

Direct causes

The accident had two direct causes: first the inexperienced driver, Robert Jeffrey, mistook the signals, and then the train stop failed to protect the train due to a design error.

Signals

The TTC subway uses conventional lineside signals without cab signaling. Thus drivers are expected to remember each signal aspect and act accordingly until they receive new information from the following signal. The following description is limited to aspects relevant to the accident.

Some signals are "automatic" and have a single head that shows one of the three basic colors. Red means stop, yellow means that the next signal is red and the driver should prepare to stop, and green means that the next signal is not red and it is safe to proceed at normal speed.

"Interlocking" or "home" signals have a double head and show two colored lights. The top light has the same meaning as for an automatic signal. The second light is red if the top light is red; otherwise it shows yellow if the switches are set for a secondary route, and green for the main route or if no relevant switches exist. Thus the combination yellow over green means the same as a single yellow.

At locations such as downgrades, curves, and switches, as well as serving their normal function, the same signals additionally serve to enforce speed limits. The system is called "grade timing", and is indicated by an additional "lunar white" light below the one or two colored lights just described. The white light means that the next signal is red (or double red) "only" because of grade timing, and if the train approaches at the proper speed, the signal will clear to a less restrictive aspectbefore it gets there. If the train goes too fast, it will pass the red signal and be stopped by the train stop.

In 1995 the second signal did not provide any confirmation that it was about to change; the driver was simply expected to remember the previous signal aspect correctly. And with the tolerant attitudes of management, it had become common practice for drivers to travel at the fastest speed that the system allowed, passing the second signal at the same instant it was clearing.

A long downgrade will have several consecutive grade-timing sections. If all the signals are automatic and no trains are present, the first signal will therefore be yellow over white, followed by a series of red over whites, and finally a red. When a train approaches each red over white signal, it clears to yellow over white and the train stop is lowered; and the final red signal clears to green. Interlocking signals can also take part in grade timing, with aspects such as yellow over green over white (meaning the same as yellow over white).

From St. Clair West to Dupont the subway runs continuously downhill and grade timing is used. The signal at the end of St. Clair West station, SP77/X38, is an interlocking signal and therefore shows yellow over green over white whenever there is nothing to delay a train. As Jeffrey's train passed it, however, it was showing yellow over green. He should have stopped at the following signal, SP71, which was red because of another train ahead.

After the accident Jeffrey said he remembered SP77/X38 as yellow over white, actually an impossible aspect for that signal. He must either have misremembered it at the time, or else been fooled by some reflection off the signal head into thinking he'd seen the usual yellow over green over white, and subsequently remembered this false sighting. In any case, he believed that grade timing was in use and so approached signal SP71 at the same speed as he would normally drive on this section.

After this Jeffrey did not remember what he had seen, but it is easy to reconstruct the events. When the train passed SP71 without him seeing it change, he must have assumed that he had passed it just as it cleared. He would now have continued coasting downhill, still thinking that he was under grade timing, without realizing that if this was true, the signal would have shown red over white as he approached.

He must therefore have expected the third signal, SP65, to clear in the same way. Again it was showing red, not red and white, but Jeffrey repeated his mistake, and braked only when he actually saw the train just ahead (it was stopped at the next signal, SP53); and that was much too late.

(News media accounts of the accident often say that Jeffrey "passed three red lights." This count includes the repeater signal provided in advance of SP65 because a curve in the tunnel interferes with sighting. Drivers are not expected to stop at the repeater even if it is red.)

Train stop

The "trip" or "train stop" consists of a T-shaped arm placed just outside the right-hand rail near each signal (except a repeater). If the signal is red (or double red), with or without a lunar white, the trip arm rises enough for its crossbar to strike a "trip valve" or "tripcock" lever on the bottom of a train's first car as it passes; this triggers the emergency brake.

On the relevant class of trains, the trip valve is located near the center of the right side of the leading bogie, where its position in relation to the rail is well controlled.

Wismer and Becker, Inc., the contractors who installed the signal system on this part of the subway, chose to use an Ericsson train stop that was designed to have the trip arm located in the middle of the track. They had a subcontractor, Gayle Manufacturing, design a mechanical extension that would allow the device to drive a trip arm in its actual position outside of the rail.

What was not realized was that the mechanism they designed, when the trip arm was raised, fell foul of the clearance envelope specified for the train.

When everything was new, this didn't matter. The train did not fill its entire clearance envelope, and the trip arm would contact the trip valve normally. However, with normal wear of the wheels and rails, "and" with the train rounding a curve at speed and thus tending to ride off-center toward the outside of the curve, it was another matter. The first wheel on the right-hand side of the train would hit a bolt in the mechanism attached to the trip arm and "knock the arm down". It would then rise again, but too late: with the train moving fast, the trip valve, just a few feet behind the wheel, would already have gone past.

Thus the train stop would work in any circumstance except the one when it was most seriously needed.

Inquest

The jury at the coroner's inquest produced 18 recommendations:

#Reform of the Railways Act (1950) to provide oversight of the Toronto Transit Commission.
#The TTC should submit to an independent safety audit every two years, beyond that done by APTA. This independent agency will be set up under the revised Railway Act.
#Completion of the "Due Diligence Checklist" of deficiencies identified by the TTC.
#The Province and Metro commit to a "State of Good Repair" funding policy; repair to take precedence over new works (see Sheppard Line); future capital funding based on the State of Good Repair. The jury indicated that underfunding since the mid-1980's has contributed to the deterioration of the system and had jeopardized the safety of the Toronto Transit Commission.
#Improvements to the Operations Training Centre starting with the hiring of an accredited adult training specialist. The updated training package should include at least: realistic pass / fail grading, annual refresher for all operators, emphasis on the meaning of the signal system, route supervisory accompaniment for at least one day of complete runs after training completion.
#An updated Operations Training Centre to include a suitable subway simulator.
#A comprehensive review of the signal system with emphasis in the following areas: Lunar Whites, removal of signal identification markers, consistent placement of signal aspects, progressive speed control, expansion of IPHC to identify headway and train separation, all trip valves activated and relocation of reset.
#Elimination of auto key-by facility and implementation of raised trip arm immediately after train has passed.
#Advanced implementation of the new subway communications system.
#Improved communication within the organisation.
#A new Transit Control Centre including the updating of the skills of TTC staff.
#The current Transit Control Centre should only be responsible for Operations. Such things as intrusion alarms, facility maintenance, public information, media relations and other related concerns should be handled by an adjacent facility.
#Emergency response exercise every five years with "everybody". Yearly reviews by the Safety department
#Improved predictive and preventative maintenance with computer assist where applicable.
#Review of equipment procurement with respect to quality control. The procurement of cheap equipment (the Ericsson train stops) is a misuse of resources and a serious safety issue.
#Traceable design criteria and standards for track, signal and subway cars. No modifications without approval of design review authority.
#Train operators and the TTC must identify signal malfunctions by signal identification numbers. Review of the discipline system to allow for signal malfunctions. Operators reporting for duty to meet an inspector so that "State of the road" information can be passed on. Rookie operators not to be scheduled together.
#The office of the Chief Coroner is to convene a press conference one year hence to provide all parties with an update on the implementation of these recommendations.

The direct causes corrected

The TTC acted quickly following the accident to repair the defective modified Ericsson train stops. They also began requiring drivers to traverse grade-timing sections at a speed that would allow them to actually see the red signal change before they left the section.

In 1997 and 1998, the behaviour of the signals themselves was changed. Now, when a signal is red (or double red) only because of grade timing, the (top) red light flashes during the last few seconds before it clears. The trip arm remains up during this phase, but the flashing red confirms to the driver that there was a lunar white on entry to the section and that the signal can be expected to clear at any moment. Jeffrey's mistaken interpretation of the red signal SP71 would no longer be possible.

Other Information

In 2003, Toronto's Tarragon Theatre produced a play by Chris Earle, called Russell Hill, about the incident.

References

External links

* [http://transit.toronto.on.ca/archives/data/200508061136.shtml Transit Toronto - News Archive: 10 years after ]
* [http://archives.cbc.ca/IDC-1-75-1099-6107/science_technology/subways_history/clip11 Terrible Tragedy in Toronto ]


Wikimedia Foundation. 2010.

Игры ⚽ Поможем решить контрольную работу

Look at other dictionaries:

  • Toronto subway and RT — A T series train at Sheppard–Yonge station on the Sheppard line …   Wikipedia

  • Davisville Subway Yard — A G series train at Davisville, circa 1969 Tr …   Wikipedia

  • Dupont (Toronto Subway) — Eingang zur Station Dupont ist eine unterirdische U Bahn Station in Toronto. Sie liegt an der Yonge University Spadina Line der Toronto Subway, an der Kreuzung von Spadina Road und Dupont Street. Die Station, die über Seitenbahnsteige verfügt,… …   Deutsch Wikipedia

  • United States Capitol subway system — Info Owner U.S. Government Locale United States Capitol Complex …   Wikipedia

  • United States Capitol Subway System — Infobox Public transit name = Capitol Subway System imagesize = 215px locale = Capitol Hill, Washington, D.C. transit type = Light rail began operation = March 7, 1909 ended operation = system length = lines = 3 vehicles = stations = 6 ridership …   Wikipedia

  • Toronto Transit Commission — TTC redirects here. For other uses, see TTC (disambiguation). Toronto Transit Commission From top left: An Orion VII TTC bus, a T series TTC subway train, an …   Wikipedia

  • List of rail accidents (1950–1999) — List of rail accidents from 1950 to 1999.For historic accidents before 1950, see List of pre 1950 rail accidents .For accidents from 2000 to the present, see List of rail accidents . notoc 1950s 1950* February 17 1950 ndash; Rockville Centre, New …   Wikipedia

  • Eglinton–Scarborough Crosstown line —      Eglinton–Scarborough Crosstown Overview Type Premetro …   Wikipedia

  • Toronto Transit Commission facilities — are bus garages, carhouses, and subway yards for fleet and rolling stock of the Toronto Transit Commission. Contents 1 Current 1.1 Arrow Road Bus Garage 1.2 Birchmount Bus Garage …   Wikipedia

  • Sheppard line — For the subway station on the same line, see Sheppard–Yonge (TTC).      Sheppard Line Platform level of Don Mills Station …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”