Cerro Prieto Geothermal Power Station

Cerro Prieto Geothermal Power Station
Cerro Prieto Geothermal Power Station
Country Mexico
Location South Mexicali, Baja California
Coordinates 32°24′43″N 115°14′41″W / 32.41194°N 115.24472°W / 32.41194; -115.24472 (Cerro Prieto I)Coordinates: 32°24′43″N 115°14′41″W / 32.41194°N 115.24472°W / 32.41194; -115.24472 (Cerro Prieto I)
32°23′27″N 115°13′33″W / 32.39083°N 115.22583°W / 32.39083; -115.22583 (Cerro Prieto II)
32°23′52″N 115°14′18″W / 32.39778°N 115.23833°W / 32.39778; -115.23833 (Cerro Prieto III)
32°24′15″N 115°12′43″W / 32.40417°N 115.21194°W / 32.40417; -115.21194 (Cerro Prieto IV)
Status Operational
Commission date 1973
Power station information
Primary fuel Geothermal
Generation units CP1: 4 × 37.5MW, 1 × 30MW
CP2: 2 × 110MW
CP3: 2 × 110MW
CP4: 4 × 25MW
CP5: 2 × 50MW
Power generation information
Installed capacity 720 MW

The Cerro Prieto Geothermal Power Station is the largest geothermal power station in the world, with an installed capacity of 720 MW, with plans for expansion up to 820 MW by 2012.[1][2] The facility is located in south Mexicali, Baja California, in Mexico, and is built in five individual units, namely CP1, CP2, CP3, CP4 and CP5.

Contents

Stations

Cerro Prieto I

The CP1 powerhouse has a total installed capacity of 180 MW,[3] generated by four units of 37.5 MW and one unit of 30 MW. Units 1 and 2 of this powerhouse was commissioned between 1973, followed by 3 and 4 in 1981.[4]

Cerro Prieto II

The CP2 powerhouse has a total installed capacity of 220 MW,[3] generated by two 110 MW units which were commissioned in 1982.[4]

Cerro Prieto III

The CP3 powerhouse has a total installed capacity of 220 MW,[3] generated by two identical units as CP2, measuring 110 MW. This powerhouse was commissioned in 1983, a year after the commissioning of CP2.[4]

Cerro Prieto IV

The CP4 station commenced operations in July 2000, and consists of four turbines, each with a capacity of 25 MW.[2][3][4][5]

Cerro Prieto V

The CP5 station is the newest powerhouse of the Cerro Prieto station. It was proposed in July 2009, with the commencement of constructions in September 2009. CP5 will consist of two 50 MW units, increasing the total capacity of the Cerro Prieto Geothermal Power Station by 100 MW.[1]

See also

  • List of power stations in Mexico
  • List of geothermal power stations
  • List of largest power stations in the world


References


Wikimedia Foundation. 2010.

Игры ⚽ Поможем написать курсовую

Look at other dictionaries:

  • Cerro Prieto — Coordinates: 32°25′05″N 115°18′29″W / 32.418°N 115.308°W / 32.418; 115.308 Cerro Prieto (Cocopah …   Wikipedia

  • Liste des plus grandes centrales au monde — L article suivant énumère cinq des plus grandes stations de puissance dans le monde de chaque type, en termes de puissance électrique installée actuellemnet. Les centrales à énergie non renouvelables sont celles qui fonctionnent en consommant des …   Wikipédia en Français

  • Mexicali —   City   Ciudad de Mexicali City of Mexicali Images from top, left to right: Mexicali at nigh …   Wikipedia

  • New River (Mexico — Rio Nuevo redirects here. For other uses, see Rio Nuevo (disambiguation). New River Rio Nuevo Map of the New River (left) Watershed; Alamo River on the right. Origin near Cerro Prieto …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”