The snail darter controversy involved the delay of the construction of the Tellico Dam on the Little Tennessee River in 1973. On August 12 1973, University of Tennessee biologist and professor David Etnier discovered the snail darter in the Little Tennessee River while doing research related to a lawsuit involving the National Environmental Policy Act (NEPA). The lawsuit stated that the Tellico Reservoir, to be created by Tellico Dam, would alter the habitat of the river to the point of extirpating the snail darter. The NEPA lawsuits slowed the construction of the Tellico Dam but did not stop it.

upreme Court hearing

The United States Congress had been inconsistent regarding the snail darter and the Endangered Species Act. Appropriations committees in both the House and Senate had taken a strong position against the snail darter. A 1977 Senate Appropriations Committee report stated:

This committee has not viewed the Endangered Species Act as preventing the completion and use of these projects which were well under way at the time the affected species were listed as endangered. If the act has such an effect, which is contrary to the Committee’s understanding of the intent of Congress in enacting the Endangered Species Act, funds should be appropriated to allow these projects to be completed and their benefits realized in the public interest, the Endangered Species Act not withstanding.

The case reached the Supreme Court. With Chief Justice Warren Burger writing for the majority, the court replied to the Tennessee Valley Authority's arguments and expanded on its decision: [ [http://caselaw.lp.findlaw.com/scripts/getcase.pl?court=us&vol=437&invol=153 Supreme Court Decision: TVA v. Hill, 437 U.S. 153 (1978)] ]

*The language of the Act made no exceptions for projects like Tellico that were well under way when Congress passed the act.
*It is clear from the Act’s legislative history that Congress intended to halt and reverse the trend toward species extinction. The pointed omission of the type of qualified language previously included in endangered species legislation reveals a conscious congressional design to give endangered species priority over the “primary missions” of federal agencies. Congress, moreover, foresaw that on occasion this would require agencies to alter ongoing projects in order to fulfill the Act’s goals.
*Though statements in Appropriations Committee Reports reflected the view of the Committees either that the Act did not apply to Tellico or that the dam should be completed regardless of the Act’s provisions, nothing in the TVA appropriations measures passed by Congress stated that the Tellico project was to be completed regardless of the Act’s requirements. When voting on appropriations measures, legislators are entitled to assume that the funds will be devoted to purposes that are lawful and not for any purpose forbidden. A contrary policy would violate the rules of both Houses of Congress, which provide that appropriations measures may not change existing substantive law. An appropriations committee’s expression does not operate to repeal or modify substantive legislation.
*The Court of Appeals did not err in ordering that completion of Tellico Dam, which would have violated the Act, be enjoined. Congress has spoken in the plainest words, making it clear that endangered species are to be accorded the highest priorities. Since that legislative power has been exercised, it is up to the Executive Branch to administer the law and for the Judiciary to enforce it when, as here, enforcement has been sought.

Burger’s opinion made it clear that, as written, the Endangered Species Act explicitly forbade the completion of such projects as Tellico if the Secretary of Interior had determined that such a project would likely result in the elimination of a species. Regardless of the fact that over $100 million had been spent by 1978, and the dam was substantially finished, the court could not allow the TVA to finish the project. According to Burger, this would force the court “to ignore the ordinary meaning of plain language."

The Supreme Court decision set off a fury in Congress as some members sought to rework the act. In his tome "The Fishes of Tennessee", David Etnier later wrote: “the snail darter had become almost a household word, and in current usage ‘snail darter types’ is approximately synonymous with ‘ultra-liberal environmental activists.’” [Etnier, David A. and Wayne C. Starnes. The Fishes of Tennessee. Knoxville: The University of Tennessee Press, 1993.]

Two Tennessee legislators get involved

Two members of Congress from Tennessee quickly became critical to the Tellico story: Congressman John Duncan, Sr., whose district included Tellico, and Senator Howard Baker. Duncan had been a long-time congressional supporter of the project. On the other hand, Baker was a very late comer to Tellico. As it would turn out however, he would play a critical role in the future of the Little Tennessee River valley. Howard Baker was a leading sponsor of an amendment to the Endangered Species Act that was passed into law in November 1978. The idea was to create a mechanism whereby a specific project could be excluded from the Endangered Species Act. If a controversy arose, the amendment called for the creation of a special committee consisting of various Cabinet level members and at least one member from the affected state where the project in question was located. It came to be known as the “God Committee” because if they exercised their power to exempt a project from the act, they were in effect acting like God and destroying an entire species.

There was a fear in Congress that many projects in the country would be affected by litigation as biologists might set out to discover obscure species, including insects or even micro-biotic life forms. The proponents of the “God Committee” amendment saw it as a way of keeping the Endangered Species Act alive. According to the Burger opinion, U.S. Endangered Species laws at that time “represented the most comprehensive legislation for the preservation of endangered species ever enacted by any nation.”

Instead of granting Tellico an exemption from the Endangered Species Act, the committee voted unanimously in favor of the snail darter. On January 23 1979, the Committee unanimously denied an exemption for Tellico specifically on economic grounds, rather than ecological grounds. “I hate to see the snail darter get the credit for stopping a project that was ill-conceived and uneconomic in the first place,” said Chairman Andrus. The reservoir project deserved to be killed on its own merits. As Charles Schultze, Chairman of the Council of Economic Advisors and a member of the Committee, said, “Here is a project that is 95% complete, and if one takes the cost of finishing it against the total project benefits, and does it properly, it doesn’t pay, which says something about the original design.” [Zygmunt J. B. Plater, "Reflected in a River: Agency Accountability and the TVA Tellico Dam Case", Tennessee Law Review, Summer 1992, Volume 49, Number 4, 754.]

The opposition would make much of the problematic benefit-cost issue throughout the 1970s. Despite his credentials as one of the nation’s top economists, however, Schultze was no more prepared to accurately predict future benefits than anyone else at the time. Wheeler and McDonald [William Bruce Wheeler and Michael J. McDonald, "TVA and the Tellico Dam 1936-1979: A Bureaucratic Crisis in Post-Industrial America" (Knoxville: The University of Tennessee Press, 1986)] state the problem was TVA’s general unfamiliarity with econometric models used to come up with benefit-cost ratios. Such models require some underlying assumptions. Wheeler and McDonald identify five general assumptions TVA used and declared them all to be false. They were: (1) The Tellico area would remain economically static without the project. (2) All economic projects that occurred in the area after completion of the project should be attributed to the project. (3) If an economic benefit could take place at Tellico, then it would. (4) The Tellico Project would not detract from any economic benefits already being enjoyed in the area. (5) Once set, costs would not rise faster than the normal annual inflation rate of the early 1960s.

Congress had updated and strengthened the Endangered Species Act in 1973. Tellico Dam opponents had successfully sued under the provisions of that law to stop the dam. The Supreme Court had stated that as written, it was clear that Congress intended to protect all species including the snail darter. In 1978 Congress amended the law with the case of the snail darter specifically in mind.

Baker then drafted an amendment that excluded the Tellico project from the Endangered Species Act, along the lines initially suggested by the federal courts. Duncan got the amendment passed by the House on June 18 1979, on a voice vote. The vote became infamous among dam opponents. Baker introduced the amendment in the Senate on July 17 and was defeated on a vote of 45-53. Undeterred, Baker reintroduced the amendment in September. Baker spoke in favor of his amendment on the Senate floor:

Mr. President, I hope this is the last time around. I hope we can resolve this issue once and for all, and I hope reason will finally prevail. . . .

Mr. President, the awful beast is back. The Tennessee snail darter, the bane of my existence, the nemesis of my golden years, the bold perverter of the Endangered Species Act is back.

He is still insisting that the Tellico Dam on the Little Tennessee River, a dam that is now 99% complete, be destroyed.

p>In the midst of a national energy crisis, the snail darter demands that we scuttle a project that would produce 200 million kilowatt hours of hydroelectric power and save an estimated 15 million gallons of oil.

Although other residences have been found in which he can thrive serenely, the snail darter stubbornly insists on keeping this particular stretch of the Little Tennessee River as his principal domicile. ...

Let me stress again, Mr. President, that this is fine with me. I have nothing personal against the snail darter. He seems to be quite a nice little fish, as fish go.

Now seriously Mr. President, the snail darter has become an unfortunate example of environmental extremism, and this kind of extremism, if rewarded and allowed to persist, will spell the doom to the environmental protection movement in this country more surely and more quickly than anything else. ...

We who voted for the Endangered Species Act with the honest intentions of protecting such glories of nature as the wolf, the eagle, and other treasures have found that extremists with wholly different motives are using this noble act for meanly obstructive ends. ...

Completion of dam

On September 10 1979, Baker's amendment passed on a vote of 48 to 44. 28 Republicans and 20 Democrats supported it. 10 Republicans and 34 Democrats opposed it. The next step for Tellico was President Carter’s desk.On September 25 1979, Jimmy Carter signed the bill that exempted Tellico from the Endangered Species Act. Tellico was never exempted from all laws as many would later claim.

On November 29 1979, with retired TVA Chairman Red Wagner watching, the TVA closed the gates on the Tellico Dam. Before the closure of the gates of Tellico Dam, numerous snail darters were transplanted into the Hiwassee River. The snail darter was taken off the endangered species list in the 1980s.

Notes

References

* U.S. Senate Report Number 95-301, (1977): 99.
* Jim Range, telephone interview with Jim Breitinger, February 27 2001. Master's thesis, University of Utah, 2001.
* Congressional Record—Senate S12274, September 10 1979.


Wikimedia Foundation. 2010.

Игры ⚽ Поможем написать курсовую

Look at other dictionaries:

  • Snail darter — Taxobox name = Snail darter status = VU status system = iucn2.3 image width = 250 regnum = Animalia phylum = Chordata classis = Actinopterygii ordo = Perciformes familia = Percidae genus = Percina species = P. tanasi binomial = Percina tanasi… …   Wikipedia

  • snail darter — a tan, striped, snail eating perch, Percina tanasi, 3 in. (7.5 cm) long, occurring only in the Tennessee River: a threatened species. [1970 75] * * * Rare species (Percina tanasi) of darter that originally was found only in the Little Tennessee… …   Universalium

  • darter — /dahr teuhr/, n. 1. a person or thing that darts or moves swiftly. 2. anhinga. 3. any of several small, darting, freshwater fishes of the perch family, inhabiting streams of eastern North America. [1555 65; DART + ER1] * * * Any of about 100… …   Universalium

  • Tellico Dam — is a dam built by the Tennessee Valley Authority (TVA) in Loudon County, Tennessee on the Little Tennessee River just above the main stem of the Tennessee River. It impounds the Tellico Reservoir.Construction of the Tellico Dam was controversial… …   Wikipedia

  • Tellico Village, Tennessee — Tellico Village is a planned community on the western shore of Tellico Reservoir in Loudon County, Tennessee, United States, about convert|30|mi|km southwest of Knoxville. The community has an area of about convert|5000|acre|km2 and an… …   Wikipedia

  • Pinaleno Mountains — Geobox|Range name=Pinaleño Mountains image size= image caption= country=United States state=Arizona geology=|orogeny= highest=Mount Graham highest lat d=32|highest lat m=42|highest lat s=05|highest lat NS=N highest long d=109|highest long… …   Wikipedia

  • Howard Baker — Infobox Senator | name=Howard Henry Baker, Jr. nationality=American jr/sr=United States Senator state=Tennessee party=Republican term start=January 3, 1967 term end=January 3, 1985 preceded=Ross Bass succeeded=Al Gore date of birth=birth date and …   Wikipedia

  • Tellico River — Infobox River | river name = Tellico River caption = The Tellico River near Tellico Plains, Tennessee origin = Cherokee County, North Carolina mouth = Tellico Reservoir of the Little Tennessee River; Monroe County, Tennessee basin countries =… …   Wikipedia

  • Tellico Reservoir — Infobox lake lake name = Tellico Reservoir image lake = caption lake = image bathymetry = caption bathymetry = location = Tennessee coords = coord|35.777778| 84.259722|region:US type:waterbody|display=inline,title type = reservoir inflow =… …   Wikipedia

  • Hiwassee River — River, southeastern U.S. Rising in the Blue Ridge in northern Georgia, it flows 132 mi (213 km) into North Carolina and southeastern Tennessee to join the Tennessee River at the Chickamauga Reservoir. It has three major Tennessee Valley Authority …   Universalium

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”