Deenbandhu Chhotu Ram Thermal Power Station

Deenbandhu Chhotu Ram Thermal Power Station

Coordinates: 30°06′34″N 77°19′32″E / 30.109568°N 77.325511°E / 30.109568; 77.325511

Deenbandhu Chhotu Ram Thermal Power Station
Country India
Location Yamunanagar, Yamuna Nagar, Haryana
Status Active
Commission date 2007
Operator(s) HPGCL
Power station information
Primary fuel Coal-fired
Generation units 2
Power generation information
Installed capacity 600.00 MW
Source: hpgcl.gov.in

Deenbandhu Chhotu Ram Thermal Power Plant is located at Yamunanagar in Haryana. The power plant is one of the coal based power plants of HPGCL. It was jointly constructed by Reliance Energy Limited and Shanghai Electric (China) in a collaboration.

Contents

History

The project was first conceived in 1981-82 but it remained in suspended animation for more than two decades. The previous governments tried to implement the project, first through the private sector, then through the National Thermal Power Corporation, and thereafter attempts were also made to get it executed through foreign investments.But the project remained only on paper because governments were not serious about setting up this project. Former Indian prime minister, P V Narasimha Rao even laid the foundation stone of this project through remote control from Faridabad in March 1993. At that time, the project was planned to be executed by NTPC, but that too could not go beyond construction of a few residential and non-residential buildings. In year 2004 then chief minister of Haryana Om Prakash Chautala again laid the stone of this thermal plant but again the project remained on papers only. But in year 2005 the new chief minister of Haryana Bhupinder Singh Hooda gave nod to the project and the plant was finally developed in 2005-2008. [1]

Power plant

Deenbandhu Chhotu Ram Thermal Power Station has an installed capacity of 600 MW. The First unit was commissioned in April 2008. This is the first project in the state to award to private developer.[2] The total available land of the project is 1107 acers. First unit was commissioned in a record period of 27 months which is the lowest for any coal based green field project in the country. The plant gets coal from Central coal fields.

Panorama of plant at night

Installed capacity

Stage Unit Number Installed Capacity (MW) Date of Comisioning Status
First 1 300 April, 2008 Running
First 2 300 June, 2008 Running

Future Expansions

HPGCL has announced the expansion of this plant. A 660 MW capacity additional super critical Thermal Unit at Yamuna Nagar will be constructed as an extension which will start generating electricity in 2014. [3]

See also

  • Panipat Thermal Power Station I
  • Panipat Thermal Power Station II
  • Faridabad Thermal Power Station
  • Rajiv Gandhi Thermal Power Station

References


Wikimedia Foundation. 2010.

Игры ⚽ Поможем решить контрольную работу

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”