MasterCard Center

MasterCard Center
MasterCard Center
万事达中心
Multicoloured Wukesong Arena Facade (crop).jpg
Exterior of arena
Former names Wukesong Culture & Sports Center (2008-2011)
Location Beijing, China
Broke ground March 29, 2005
Opened January 11, 2008 (2008-01-11)
Renovated 2009
Closed October 2008 - November 2009
Owner Bloomage International Investment Group
Operator Beijing Wukesong Arena Management Co. Ltd
Architect Gu Yonghui
Capacity 18,000
Website mastercardcenter.com.cn
Tenants
Chinese Olympic Committee
2008 Summer Olympics

The MasterCard Center is an indoor arena for the 2008 Summer Olympics basketball preliminaries and finals. Ground was broken on March 29, 2005 and construction was completed on 11 January 2008. The stadium has a capacity of 18,000 and covers an area of 63,000 square metres. It was scaled back from its original design due to a 43% budget cut.[citation needed]

The stadium was constructed by "Beijing Wukesong Cultural & Sports Co. Ltd." whose five shareholders are Zhongguancun CENCONS Group, Haidian State-owned Assets Investment Co. Ltd, Beijing Urban Construction Group Co. Ltd, Beijing Urban Construction Co. Ltd and the Tianhong Group. After the Olympic Games, the center will become an important part of Beijing's Olympic Games heritage, and will allow citizens in the western districts and Beijing as a whole to enjoy cultural, sports, leisure, recreational and commercial activities. It will be a large-scale comprehensive project rare in Beijing in integrating cultural and sporting functions and commercial purposes with large-scale gardens and green space. South Korean best boy group Super Junior held their sold-out concert as part of their Super Junior 2nd Asia Tour Super Show 2 Tour

Baseball field

Wukesong Baseball Field during the MLB China Series in 2008.

The Wukesong Baseball Field (simplified Chinese: 五棵松棒球场; traditional Chinese: 五棵松棒球場; pinyin: Wǔkēsōng Bàngqiúchǎng) is a baseball stadium located next to the Wukesong Indoor Stadium at the Wukesong Culture and Sports Centre in Beijing, China. It is one of the 9 temporary venues at the 2008 Summer Olympics. It hosted baseball events.

The baseball field has a total land surface of 12,000 square metres and a capacity of 15,000. It includes 2 competition fields and 1 training field.

In March 2008, the stadium hosted two games between the Los Angeles Dodgers and San Diego Padres called the MLB China Series, marking the first time Major League Baseball teams played in China. 

In what was to be the final Olympic Baseball matches in the foreseeable future, as the International Olympic Committee voted-out the baseball event for the upcoming 2012 London Olympics and 2016 Rio de Janeiro Olympics in favor of golf and rugby sevens[1], Team USA clenched the bronze medal, while South Korea beat Cuba to claim the gold medal[2].

After the Olympic games ended, the facilities were demolished, as planned, for a shopping mall.[3][4][5]

Procurement information

  • Main building: construction materials, ventilation equipment, electrical equipment, water supply and drainage etc.
  • Sports field: special wooden sports flooring
  • Accessory equipment: stands seats, stand protection and lifting system, illumination, electronic displays, communication and broadcasting equipment, fire fighting equipment etc.
  • An Information Age building: network system equipment, network technical equipment, network solutions, security system, database technologies and products.
  • An Intelligent building: acoustical equipment, air conditioning, elevators, electronic monitoring, electronic fire-fighting systems, etc.
  • Outdoor engineering: garden, afforestation and square tiles etc.
  • Project Venue: The project is located at the intersection of the extended section of Chang'an Street and the West 4th Ring, adjacent to Wukesong Station on metro Line 1.
  • Construction Scale: The planned construction area is about 350,000 square meters.
  • Construction Schedule: Construction began in March 2005. The baseball field will be started in second half of the year 2005, completed in May 2007 and the stadium will be completed in August 2007.

References


Coordinates: 39°54′33″N 116°16′23″E / 39.90917°N 116.27306°E / 39.90917; 116.27306


Wikimedia Foundation. 2010.

Игры ⚽ Поможем сделать НИР

Look at other dictionaries:

  • MasterCard Centre — This article is about the hockey arena in Toronto. For the indoor arena in Beijing, see MasterCard Center. MasterCard Centre Full name MasterCard Centre for Hockey Excellence Location 400 Kipling Avenue Toronto, Ontario, CAN M8Z 5C8 Coordinates …   Wikipedia

  • Center for Sustainable Global Enterprise — [http://www.johnson.cornell.edu/sge/ The Center for Sustainable Global Enterprise] (CSGE) is one of [http://www.johnson.cornell.edu/research/ two centers of research, learning, and practice] in the S.C. Johnson Graduate School of Management at… …   Wikipedia

  • MasterCard — В этой статье не хватает ссылок на источники информации. Информация должна быть проверяема, иначе она может быть поставлена под сомнение и удалена. Вы можете …   Википедия

  • World Trade Center Dubai — Dubai World Trade Centre en Diciembre de 2007 El Dubai World Trade Centre (DWTC) (en árabe: مركز التجارة العالمي دبي) es un complejo de negocios en Dubai, Emiratos Árabes Unidos, construido por Su Alteza el Jeque Rashid bin Saeed Al Maktoum. Se… …   Wikipedia Español

  • Charm School Tour — мировой тур Roxette Места проведения Европа Азия Африка Сев. Америка Ю. Америка Австралия К альбому Charm School Начало тура 28 февраля 2011 года Конец тура …   Википедия

  • American Express — Company Type Public Traded as NYSE: AXP Dow Jones Component …   Wikipedia

  • New York City Subway — Top: A number 4 train made up of R142 …   Wikipedia

  • Credit card fraud — Personal finance Credit and debt Pawnbroker Student loan Employment contract Salary Wage Empl …   Wikipedia

  • Chargekarte — Kreditkarten Eine Kreditkarte ist eine Karte zur Zahlung von Waren und Dienstleistungen. Sie ist weltweit einsetzbar, sowohl im realen täglichen Geschäfts wie Privatleben als auch bei Online Geldtransaktionen. Sie wird im Fall von MasterCard oder …   Deutsch Wikipedia

  • Firmenkreditkarte — Kreditkarten Eine Kreditkarte ist eine Karte zur Zahlung von Waren und Dienstleistungen. Sie ist weltweit einsetzbar, sowohl im realen täglichen Geschäfts wie Privatleben als auch bei Online Geldtransaktionen. Sie wird im Fall von MasterCard oder …   Deutsch Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”