Wonthaggi desalination plant

Wonthaggi desalination plant
Wonthaggi desalination plant
Victoria
{{{alt}}}
Location within Victoria
Desalination plant
Location Wonthaggi, Victoria
Coordinates 38°35′19″S 145°30′47″E / 38.58861°S 145.51306°E / -38.58861; 145.51306Coordinates: 38°35′19″S 145°30′47″E / 38.58861°S 145.51306°E / -38.58861; 145.51306
Estimated output 410 megalitres per day
Extended output 550 megalitres per day
Cost A$3.5 billion[1]
Energy generation offset Windfarm at Glenthompson (proposed)
Technology Reverse Osmosis (proposed)
Percent of water supply Estimated 33% of Melbourne
Operation date under construction
Location map of the proposed site

The Wonthaggi Desalination Plant (also referred to as the Victorian Desalination Project) is a water desalination plant currently under construction on the Bass Coast near Wonthaggi, in southern Victoria, Australia, scheduled to be completed by the end of 2011. When completed, the plant will be an integral part of Victoria's water system, supplying water via a series of existing and proposed pipelines.[2][3]

The desalination plant was promoted through the late 2000s in response to the water restrictions and population growth as being part of the Victorian Government's "Our Water, Our Future" water plan. Marketing material was via print, digital and television advertisements, and included other associated projects such as the North-South Pipeline, the Cardinia Pipeline and a proposed interconnector to Geelong.[4]

The plant site is about 500 metres inland and associated infrastructure will include tunnels connecting the plant to marine intake and discharge structures up to 1.2 km out to sea, an 85 kilometre pipeline to connect the plant to Melbourne's water supply system, and power supply infrastructure for the plant. The plant is intended to provide up to 150 gigalitres of additional water per year, with the potential to expand production to 200 gigalitres per year.[5]

The project has encountered a campaign of opposition from community groups and local residents, and the Australian Greens. Regular public rallies have been conducted on the site and in Melbourne since its proposal. One community group Your Water, Your Say was sent bankrupt following a lost legal case and pursued legal costs after the group legally pursued the Victorian Government over lack of reports and consultation. The case centred on initial water requirement figures, feasibility studies and environmental effects reports amongst other issues. More recently, a new opposition group Watershed Victoria, has continued the opposition campaign.

Contents

Background and project history

The disbanding of the Melbourne and Metropolitan Board of Works in 1992 transferred control over the planning process regarding major water and sewerage construction projects to developers. This process came under increased criticism during initial feasibility studies and assessments of Melbourne's water supply and the desalination plant.[6]

By June 2007, the Victorian Government released its water management strategy marketed as Our Water Our Future. As part of the plan, the government announced its intention to develop a seawater reverse osmosis desalination plant to "augment Melbourne's water supply, as well as other regional supply systems."[citation needed]

The total average inflow into Melbourne dams from 1913 to 1996 was 615GL per year, whilst average inflow 1997-2009, during the most severe drought ever recorded in Victoria, it was 376GL per year.[7] Rapid population growth has also put pressure on reserves. Reserves in the state's water storage dams have been decreasing since 1998, to around a third of maximum capacity.[8][9] Consequently, water restrictions have been in place for several years.[10]

Increased Winter-Spring rains since 2007 took water storages above 40%.[11] In early September 2010, many regions around the state flooded for the first time since the drought began in the late 1990s, prompting some to define the end of the drought in Victoria.

Proposal

Little Powlett River and rig near Wonthaggi desalination plant
Map of the proposed Cardinia Pipeline

A two-headed marine structure extending up to 2 km offshore will be constructed. It is estimated that the plant will take in 480 billion litres of seawater and pump back 280 billion litres of saline concentration every year.[12]

Associated infrastructure includes tunnels connecting the plant to marine intake and discharge structures, an 85 km pipeline to connect the plant to Melbourne's existing distribution network at Berwick, and power supply infrastructure for the plant. Water will enter the City water supply system through Cardinia Reservoir.[13]

A windfarm located at Glenthompson is proposed to be built to offset the electricity used by the plant.[14]

The plant is intended to operate at full capacity for a number of years until Melbourne's dams exceed 65% capacity.[15]

Estimated water production is 150 billion litres (150 gigalitres) of desalinated water per year, potentially capable of providing around a third of Melbourne's annual water consumption based on 2007 consumption levels. It is intended that the water produced will be supplied to Melbourne, Geelong, Western Port and South Gippsland.

When completed, the desalination plant would represent the largest addition to Melbourne's water system since the addition of the Thomson River Dam in 1983.

Environmental effects studies

In August 2008, a 1600-page environmental effects study report was prepared and found that; "...several protected species could be affected by the plant's construction and operation — including the orange-bellied parrot, the growling grass frog and the giant Gippsland earthworm — but none would be left "significantly" worse off.". The community was given 30 business days to read, study and prepare responses to the 1600-page report.[12] Watershed Victoria claimed that this was insufficient time for community groups to analyse the report and prepare submissions.

Toxicity of output

In an article published in the Age on 29 August 2011, columnist Kenneth Davidson identified that the likely boron output level above 1ppm would require the closure of the plant under the terms of the contract with the Victorian government. Boron is a cumulative toxin that affects male reproductive fitness.

Contract to build and operate

There were eight tenderers for win the contract. [1] Two consortia were short-listed for the construction and operation of the plant — AquaSure (Thiess/Suez) and BassWater (John Holland/Veolia Environmental).[16]

On 30 June 2009, the consortium AquaSure, which is made up of Degremont, Macquarie Capital and Thiess, was chosen as the winning bidder.[14] Simultaneously, it was announced that construction was scheduled to commence in late 2009, proposing that water be delivered by late 2011.[13]

Location

Bass Coast region of Victoria, indicated in yellow

Nine sites were included in the "long list" in the feasibility study. These were "short listed" to four (Surf Coast, East of Port Philip Bay, West of Western Port, and Bass Coast). The Bass Coast was chosen as the premium location.[5] Compulsory acquisition notices were issued to affected residents on 25 January 2008.[17]

The proposed site is a 20 hectare site adjacent to Williamsons Beach on the Bass Coast in south eastern Victoria. It is between Wonthaggi and Kilcunda and near the Powlett River. It is located on Bunurong land and many significant archaeological artefacts[citation needed] have previously been discovered around the construction site, including a significant[citation needed] fossil site on a nearby coastline.

Costing

  • The capital cost for the project was initially estimated to be $2.9 billion in the initial feasibility study, this was later revised to $3.1 billion[18] and then to $3.5 billion. After the winning bidder was announced it was revised to $4 billion.
  • Operating costs are to be charged by a private firm over a 25–30 year period and are estimated to be around $1.5 billion. This includes labour, replacement of membranes, chemicals costs and energy, and were initially estimated at $132 million per annum.[19] Unlike previous water infrastructure works in Melbourne, the plant will be built and operated as a public-private partnership.

A report by the Water Services Association of Australia conducted in 2008, modelling several national water-supply scenarios for 2030, determined that sourcing water supply from seawater desalination was the most energy-intensive. The report predicted that if desalination became the primary source of supplying around 300 litres per person per day, energy usage would rise by 400% above today's levels.[20]

On 12 December 2009 The Age newspaper published details of considerable areas of land made cheaply available to the plant's developers without the value of such land being included in the project's official costs.[21]

  • The average water bill for residents living in Melbourne is estimated to rise by around 64% over the next 5 years. Water price plans released by the Essential Services Commission illustrate that metropolitan water providers will charge between 87 per cent and 96 per cent more for water. Water Minister Tim Holding, has stated that; "Melbourne residents need to help pay for major water infrastructure projects, such as the desalination plant and the Sugarloaf (North South) pipeline."[22]
  • Comparatively, the Kwinana Desalination Plant in Perth was completed in 2006, has roughly 30–50% the output of the Wonthaggi plant, however, it cost $387 million to build and did not include an 85kM pipeline and windfarm.

Energy consumption

The plant is estimated to require between 90 and 120MW of electricity to operate. Additional energy will be required to pump the desalinated water from Wonthaggi to Cardinia Reservoir in Melbourne.

A commitment was made to invest in renewable energy to offset the power the plant uses in an attempt to make it carbon neutral.[citation needed]

Construction

The Victorian Government estimate approximately 4,745 full-time equivalent jobs will be generated by the project over the two-year construction period.[13] Construction work officially began on 6 October 2009.[23]

Opposition

Several community groups as well as the Australian Greens opposed the project. The community group Your Water Your Say was one of the first organised opposition groups and legally pursued the Government in relation to claims the group made concerning the plant. The government pursued legal costs, which sent the group bankrupt.[24]

Public rallies and protests have been held both at the site in Wonthaggi and in Melbourne on Spring Street outside the State Parliament buildings throughout 2007, 2008 and 2009.[25] In July 2008, a group of around 50 people conducted a rally on the site, several people were removed from Crown land, none were arrested.[26]

In June 2009, a petition including 3,000 signatories opposing the plant was presented to the Victorian Parliament.[27]

Your Water Your Say v Minister for the Environment, Heritage and the Arts

Your Water Your Say (YWYS) opposed the proposal, taking legal action against the Victorian State Government regarding non-disclosure of financial information and lack of environmental studies and reports.[28] As of July 2008 YWYS lost the action, and the Federal Court awarded costs to the State Government estimated to be up to $200,000, effectively rendering the community group broke.[24] YWYS was subsequently disbanded.

In their submission response to the EES, YWYS stated: "The Federal and State Governments are aware that YWYS is unlikely to be in a position to pay its significant legal costs and hence their apparent inability to make a decision on this front can only be interpreted as an attempt to further avoid community scrutiny of this project."[29]

Sharing of private information with private consortia

In December 2009, it was revealed that private information obtained by Victoria Police during surveillance efforts on individuals involved or corresponding with YWYS, Watershed Victoria and other community groups, had been made available to the private consortium building the desalination plant, Aquasure, via a memorandum between the State Government, Victoria Police and Aquasure.[30] Victoria Police responded by explaining that the information would be used to better "manage" future activities and potential "security threats".[30]

Timeline

2007

  • 19 June – the Victorian Government announces its intention to develop a seawater reverse osmosis desalination plant on the coast near Wonthaggi. The plant is explained to be part of a water plan marketed as Our Water Our Future.[31]
  • 28 December – the Minister for Planning for the Victorian Government determines that the project would require assessment under the Environment Effects Act 1978 and preparations for an Environment Effects Statement (EES) begin.

2008

  • 25 January – Compulsory acquisition notices issued to the residents of the proposed site.
  • 4 February – the Federal Government determines that the project will have to require approval under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).
  • 21 February–13 March – draft scoping requirements for the EES placed on public exhibition.
  • 4 May – final scoping requirements for the EES issued.
  • 13 June – Justice Heerey awards costs to the Federal and State Governments a result of the action – Your Water Your Say v Minister for the Environment, Heritage and the Arts & Anor; Federal Court Proceeding VID188/2008.
  • 5 July – The plant is addressed during the Climate Emergency Rally at various locations in Melbourne.
  • 100m of coastline is landscaped to alter the flow of Powlett River.
  • 20 August–30 September – Environment Effects Statement (EES) released for public comment by the State Government, community given 5 weeks to submit responses to the 1,600-page report.

2009

  • 11 January – Planning Minister, Justin Madden, approved a planning scheme amendment to allow for a pilot desalination plant to come into effect on 17 January.[32]
  • 30 July – Winning bidder for construction announced.
  • 6 October – Construction commenced.

2010

  • 4 February – First sections of the new pipeline are laid

2011

  • Production and related operations expected to commence by end of year

2035–2045

  • Contract for the operation of the plant expected to expire.

Photos

See also

References

  1. ^ "Partnerships Victoria: Victorian Desalination Plant". Government of Victoria. 12 July 2010. http://www.partnerships.vic.gov.au/CA25708500035EB6/0/8ACBA1C56F57CF23CA25736E0001DCE8. Retrieved 3 March 2011. 
  2. ^ D!ssent, Article by Kenneth Davidson "Water Lies", Issue 31 Summer 09/10
  3. ^ "Victorian Desalination Project". Department of Planning and Community Development. 20 February 2009. http://www.dse.vic.gov.au/DSE/nrenpl.nsf/LinkView/5249619A2A213442CA2573BE007EEAA992FBC7C133A6F520CA2572DA007FAB8B. Retrieved 2009-07-04. 
  4. ^ "The Next Stage of the Government's Plan". Melbourne Water. 16/06/2009. http://ourwater.vic.gov.au/programs/next-stage. Retrieved 2009-07-04. 
  5. ^ a b "Seawater Desalination Plant Feasibility Study – Executive Summary". Melbourne Water. June 2007. http://www.melbournewater.com.au/content/library/current_projects/water_supply/seawater_desalination_plant/feasibility_study/Desalination_plant_Feasibility_Study_Executive_Summary.pdf. 
  6. ^ The Age, 25 September 2008, "Water policy is based on flawed figures", Kenneth Davidson
  7. ^ Melbourne Water, Annual inflow chart
  8. ^ "Answers to your questions on storage levels". Melbourne Water. http://www.melbournewater.com.au/Default.asp?bhcp=1. Retrieved 2009-07-04. 
  9. ^ "Government Programs & Action – Background". Melbourne Water. http://www.ourwater.vic.gov.au/programs/desalination/background. Retrieved 2009-07-04. 
  10. ^ "Melbourne water storage levels continue to drop". ABC News. 10 March 2009. http://www.abc.net.au/news/stories/2009/03/10/2512360.htm. Retrieved 2009-07-04. 
  11. ^ Melbourne Water water storage graph 1997-2010
  12. ^ a b The Age, 21 August 2008.
  13. ^ a b c "Facts Sheet". Melbourne Water. June 2007. http://www.ourwater.vic.gov.au/__data/assets/pdf_file/0015/474/Desalination-Fast-Facts-May-2009.PDF. 
  14. ^ a b "Desal consortium selected". ABC News. 30 July 2009. http://www.abc.net.au/news/stories/2009/07/30/2641003.htm?site=news. 
  15. ^ "Dams set to receive major desal boost". ABC News. 11 July 2009. http://www.abc.net.au/news/stories/2009/07/11/2623116.htm?site=news. Retrieved 2009-07-12. 
  16. ^ Davidson, Kenneth (25 June 2009). "Water policy delivers scary possibilities". The Age (Melbourne): p. 17. http://www.theage.com.au/opinion/water-policy-delivers-scary-possibilities-20090624-cwpw.html?skin=text-only. 
  17. ^ "Compulsory acquisition notices". Your water, your say. 25 January 2008. http://www.yourwateryoursay.org/wp-content/uploads/press-release-acquisitions.pdf. 
  18. ^ "Our Water Our Future – The Next Stage of the Government’s Water Plan, Desalination Plant to Deliver 150 Billion Litres of Water Per Year". Victorian water Industry association. http://www.vicwater.org.au/index.php?sectionid=969. Retrieved 2009-07-04. 
  19. ^ "Seawater Desalination Plant Feasibility Study – Chapter 9a". Melbourne Water. June 2007. http://www.melbournewater.com.au/content/library/current_projects/water_supply/seawater_desalination_plant/feasibility_study/Desalination_plant_Feasibility_Study_Chapter_9a.pdf. 
  20. ^ The Age, 30 August 2008, "Water plant to guzzle energy", Peter Ker
  21. ^ Ker, Peter (12 December 2009). "True cost of desal plant concealed". The Age (Melbourne). http://www.theage.com.au/national/true-cost-of-desal-plant-concealed-20091211-kon0.html. 
  22. ^ ABC, "Water bills set to rise", Fri 7 November 2008 11:52am AEDT.
  23. ^ "Desal plant construction gets underway". ABC News. 6 October 2009. http://www.abc.net.au/news/stories/2009/10/06/2705702.htm. Retrieved 2009-10-06. 
  24. ^ a b Ross, Norrie (13 June 2008). "Opponents of Victorian desalination plant must pay costs". Herald Sun (www.news.com.au). http://www.news.com.au/heraldsun/story/0,21985,23857427-661,00.html. Retrieved 2008-07-19. 
  25. ^ "Desal opponents resume protest at Wonthaggi". ABC News. abc.net.au. 14 July 2008. http://www.abc.net.au/news/stories/2008/07/14/2302648.htm. Retrieved 2008-07-19. 
  26. ^ "Protesters met by police at desal site in Wonthaggi". Herald Sun (www.news.com.au). 14 July 2008. http://www.news.com.au/heraldsun/story/0,21985,24016990-661,00.html. Retrieved 2008-07-19. [dead link]
  27. ^ "Vic Parliament receives Wonthaggi desal petition". ABC News. 11 June 2009. http://www.abc.net.au/news/stories/2009/06/11/2595498.htm. Retrieved 2009-07-04. 
  28. ^ "Action group loses legal challenge over desalination". ABC News. www.abc.net.au. 16 May 2008. http://www.abc.net.au/news/stories/2008/05/16/2246614.htm. Retrieved 2008-07-19. 
  29. ^ "YWYS EES Submission". 30 September 2008. http://www.yourwateryoursay.org/2008/10/15/desalination-project-public-inquiry-your-water-your-say-submission/. 
  30. ^ a b The Age, Front Page, Saturday 5 December 2009.
  31. ^ Our Water Our Future
  32. ^ Bass Shire Council, 15 January 2009

External links


Wikimedia Foundation. 2010.

Игры ⚽ Нужно сделать НИР?

Look at other dictionaries:

  • Melbourne desalination plant — An AUD$3.1 billion desalination plant is to be built in the Wonthaggi region of the Bass Coast of Victoria, Australia by the end of 2011. The plant will supply water to Melbourne and surrounding districts. Planning The capital cost for the… …   Wikipedia

  • Desalination — This article is about removing salt from water. For soil desalination, see Soil salinity control. Water desalination Methods Distillation Multi stage flash distillation (MSF) Multiple effect distillation (MED|ME) Vapor compression (VC) Ion… …   Wikipedia

  • Wonthaggi, Victoria — Infobox Australian Place | type = town name = Wonthaggi state = vic caption = lga = Bass Coast Shire postcode = 3995 est = pop = 4239 (2006)Census 2006 AUS | id = SSC27021 | name = Wonthaggi (State Suburb) | accessdate = 2007 10 01 | quick = on]… …   Wikipedia

  • Water crisis — For other uses, see Water crisis (disambiguation). Deforestation of the Madagascar Highland Plateau has led to extensive siltation and unstable flows of western rivers. Water crisis is a general term used to describe a situation where the… …   Wikipedia

  • Melbourne — This article is about the Australian metropolis. The name may also refer to the Melbourne City Centre (also known as the Central Business District or CBD ) or the City of Melbourne (the Local Government Area within which the Melbourne City Centre …   Wikipedia

  • North–South Pipeline — The north–south pipeline crossing the Yea River at Glenburn …   Wikipedia

  • Melbourne Water — is a government owned statutory authority that controls much of the water system in Melbourne, Victoria, Australia including the reservoirs, and the sewerage and drainage system that services the city. Contents 1 Overview …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”