Gantt chart

Gantt chart

A Gantt chart is a type of bar chart that illustrates a project schedule. Gantt charts illustrate the start and finish dates of the terminal elements and summary elements of a project. Terminal elements and summary elements comprise the work breakdown structure of the project. Some Gantt charts also show the dependency (i.e, precedence network) relationships between activities. Gantt charts can be used to show current schedule status using percent-complete shadings and a vertical "TODAY" line as shown here.

Historical development

The first Gantt Chart was developed in 1896 by Karol Adamiecki, who called it a "harmonogram". Because Adamiecki did not publish his chart until 1931 - and in any case his works were published in either Polish or Russian, languages not popular in the West - the chart now bears the name of Henry Gantt (1861–1919), who designed his chart around the years 1910-1915 and popularized it in the West. [H.L. Gantt, "Work, Wages and Profit", published by "The Engineering Magazine", New York, 1910; republished as "Work, Wages and Profits", Easton, Pennsylvania, Hive Publishing Company, 1974, ISBN 0879600489.] [Gerard Blokdijk, "Project Management 100 Success Secrets", Lulu.com, 2007, ISBN 0980459907, [http://books.google.com/books?id=dgB-QWHlnrUC&pg=PA76&dq=Adamiecki+Gantt&as_brr=3&sig=Jp-mgVODNRJpxqBRM1PYJbs7mOU Google Print, p.76] ] [Peter W. G. Morris, "The Management of Projects", Thomas Telford, 1994, ISBN 0727725939, [http://books.google.com/books?id=5ekyoWaeZ1UC&pg=PA18-IA7&dq=Adamiecki+Gantt&as_brr=3&sig=xe_RAipoqlvhnu0xLkIsxx-8OAQ Google Print, p.18] ]

In the 1980s, personal computers eased the creation and editing of elaborate Gantt charts. These desktop applications were intended mainly for project managers and project schedulers. In the late 1990s and early 2000s, Gantt charts became a common feature of web-based applications, including collaborative groupware.

Although now regarded as a common charting technique, Gantt charts were considered revolutionary when they were introduced. In recognition of Henry Gantt's contributions, the Henry Laurence Gantt Medal is awarded for distinguished achievement in management and in community service.

Advantages and limitations

Gantt charts have become a common technique for representing the phases and activities of a project work breakdown structure (WBS), so they can be understood by a wide audience.

A common error made by those who equate Gantt chart design with project design is that they attempt to define the project work breakdown structure at the same time that they define schedule activities. This practice makes it very difficult to follow the 100% Rule. Instead the WBS should be fully defined to follow the 100% Rule, then the project schedule can be designed.

Although a Gantt chart is easily comprehended for small projects that fit on a single sheet or screen, they can become quite unwieldy for projects with more than about 30 activities. Larger Gantt charts may not be suitable for most computer displays. A related criticism is that Gantt charts communicate relatively little information per unit area of display. That is, projects are often considerably more complex than can be communicated effectively with a Gantt chart.

Gantt charts only represent part of the triple constraints of projects, because they focus primarily on schedule management. Moreover, Gantt charts do not represent the size of a project or the relative size of work elements, therefore the magnitude of a behind-schedule condition is easily miscommunicated. If two projects are the same number of days behind schedule, the larger project has a larger impact on resource utilization, yet the Gantt does not represent this difference.

Although project management software can show schedule dependencies as lines between activities, displaying a large number of dependencies may result in a cluttered or unreadable chart.

Because the horizontal bars of a Gantt chart have a fixed height, they can misrepresent the time-phased workload (resource requirements) of a project. In the example shown in this article, Activities E and G appear to be the same size, but in reality they may be orders of magnitude different. A related criticism is that all activities of a Gantt chart show planned workload as constant. In practice, many activities (especially summary elements) have front-loaded or back-loaded work plans, so a Gantt chart with percent-complete shading may actually miscommunicate the true schedule performance status.

See also

* List of project management software
* Henry Gantt
* Karol Adamiecki
* Program Evaluation and Review Technique (PERT)
* Event Chain Diagrams

References

External links

* [http://office.microsoft.com/en-us/excel/HA010346051033.aspx Create a Gantt chart in Excel] N.B. Site will not work without Office installed.
* [http://documentation.openoffice.org/HOW_TO/spreadsheet/gantt_pm.pdf Create a Gantt chart in Open Office Calc]
* [http://www.edwardtufte.com/bboard/q-and-a-fetch-msg?msg_id=000076&topic_id=1&topic=Ask%20E%2eT%2e Long-running discussion] regarding limitations of the Gantt chart format, and alternatives, on Edward Tufte's website
* [http://ganttproject.biz/ GanttProject Homepage - Open Source Software]
* [http://openproj.org/openproj/ OpenProj Homepage - Open Source Software]
* [http://gilallouche.com/2008/08/08/tool-1-project-management/ Gantt Chart Template for Microsoft Excel]
* [http://documentation.openoffice.org/HOW_TO/spreadsheet/pjm_template.ots Gantt Chart Template in OpenDocument Format]


Wikimedia Foundation. 2010.

Игры ⚽ Нужна курсовая?

Look at other dictionaries:

  • Gantt chart — /gant chärt/ noun A form of bar chart used to show progress in a production system, showing predicted production figures over a fixed period of time, and updated with actual figures for comparison ORIGIN: Henry L Gantt (1861–1919), US management… …   Useful english dictionary

  • Gantt chart — ➔ chart1 * * * Gantt chart UK US /ˈgænttʃɑːt/ US  / tʃɑːrt/ noun [C] GRAPHS & CHARTS ► a diagram of the stages of a piece of work, showing stages that can be done at the same time, and stages that must be completed before others can start: »The… …   Financial and business terms

  • Gantt Chart — A Gantt chart is a visual representation of a project schedule. A type of bar chart, a Gantt charts show the start and finish dates of the different required elements of a project. Henry Laurence Gantt, an American mechanical engineer, is… …   Investment dictionary

  • Gantt chart — A chart presenting a planned activity as a series of horizontal bands against a series of vertical lines representing dates (see illustration on p. 239). It can be used to measure progress on a project or to compare planned production in a period …   Big dictionary of business and management

  • Gantt chart — UK [ˈɡænt ˌtʃɑː(r)t] / US [ˈɡænt ˌtʃɑrt] noun [countable] Word forms Gantt chart : singular Gantt chart plural Gantt charts business a tool used in planning a project, which shows pieces of work and the time periods within which they should be… …   English dictionary

  • Gantt chart — [gant] noun a chart in which a series of horizontal lines shows the amount of work done in certain periods of time in relation to the amount planned for those periods. Origin early 20th cent.: named after the American management consultant Henry… …   English new terms dictionary

  • Gantt chart — A chart presenting a planned activity as a series of horizontal bands against a series of vertical lines representing dates. It can be used to measure progress or to compare planned production in a period to actual production. The technique was… …   Accounting dictionary

  • Gantt chart — /ˈgænt tʃat/ (say gant chaht) noun a chart in which a time line is the base with parallel bands ranged above it within which activities taking place within specified time periods are indicated. {named after Henry L Gantt, 1861–1919, US management …  

  • Gantt chart — A graphical portrayal of a project or activity that shows the comparative distribution of operations and responsibilities over time. Gantt charts typically display activities through the plotting of horizontal bands across a time scale …   Auditor's dictionary

  • Gantt Chart — …   Википедия

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”