Capacity planning

Capacity planning

*Capacity planning is the process of determining the production capacity needed by an organization to meet changing demands for its products. [ [http://scrc.ncsu.edu/public/DEFINITIONS/C.html Definitions: Capacity Planning and Capacity Strategy] , North Carolina State University, 2006. Retrieved January 10, 2006.] In the context of capacity planning, "capacity" is the maximum amount of work that an organization is capable of completing in a given period of time.

A discrepancy between the capacity of an organization and the demands of its customers results in inefficiency, either in under-utilized resources or unfulfilled customers. The goal of capacity planning is to minimize this discrepancy. Demand for an organization's capacity varies based on changes in production output, such as increasing or decreasing the production quantity of an existing product, or producing new products. Better utilization of existing capacity can be accomplished through improvements in Overall Equipment Effectiveness. Capacity can be increased through introducing new techniques, equipment and materials, increasing the number of workers or machines, increasing the number of shifts, or acquiring additional production facilities.

Capacity is calculated: (number of machines or workers) x (number of shifts) x (utilization) x (efficiency).

The broad classes of capacity planning are lead strategy, lag strategy, and match strategy.

Lead strategy is adding capacity in anticipation of an increase in demand. Lead strategy is an aggressive strategy with the goal of luring customers away from the company’s competitors. The possible disadvantage to this strategy is that it often results in excess inventory, which is costly and often wasteful.

Lag strategy refers to adding capacity only after the organization is running at full capacity or beyond due to increase in demand (North Carolina State University, 2006). This is a more conservative strategy. It decreases the risk of waste, but it may result in the loss of possible customers.

Match strategy is adding capacity in small amounts in response to changing demand in the market. This is a more moderate strategy.

In the context of systems engineering, capacity planningcite book | author = Neil J. Gunther| title = "Guerrilla Capacity Planning," | publisher = Springer| date = 2007 | | id=ISBN 3540261389] is used during system design and system performance monitoring.

Capacity planning for Information Technology

The relevance of System and Application Capacity Planning has been recently highlighted by the adoption of the ITIL methodology and Real Capacity Issues such as heat and power in Data Centres.

Vendors supplying analytical and discrete event capacity planning products for servers include BMC Software, HyPerformix Incorporated, Metron, Neptuny, PerfCap, Positech, and Teamquest Corporation. Examples of a network capacity planning vendors are [http://www.vpisystems.com VPIsystems] , NetQoS & OPNET Technologies: note that vendors only sell tool-sets and software enablers: considerable experience is required to implement and understand the results and limitations from any capacity planning software.

References

# Hill, Joyce (2006), [http://www.freequality.org/sites/www_freequality_org/documents/Training/Classes%20Spring%202003/PowerPoint%20Slides/Capacity%20Requirement%20Planning.ppt Capacity Requirements Planning] . Retrieved January 10, 2006.
# Krajewski, Lee J., & Ritzman, Larry P. (2005), "Operations Management: Processes and Value Chains". Upper Saddle River, New Jersey: Prentice Hall
# Lazowska, Edward D (1984), "Quantitive System Performance", Prentice-Hall, ISBN 0-13-746975-6

ee also

* Manufacturing resource planning (MRP II)
* Enterprise resource planning (ERP)
* Overall Equipment Effectiveness (OEE)


Wikimedia Foundation. 2010.

Игры ⚽ Поможем решить контрольную работу

Look at other dictionaries:

  • Capacity planning — Планирование загрузки производственных мощностей …   Краткий толковый словарь по полиграфии

  • Rough Cut Capacity Planning — (RCCP) is a term used in relationship with production planning and controlling an environment. (RCCP) is also an important part of the manufacturing process within a companies Supply Chain by evaluating capacity with availability within a… …   Wikipedia

  • finite capacity planning — noun Used to describe planning for manufacturing facilities where the capacity of the machine or work centres is included in the planning of materials and labour. Infinite capacity planning does not consider work centre capacity …   Wiktionary

  • Capacity management — is a process used to manage information technology (IT). Its primary goal is to ensure that IT capacity meets current and future business requirements in a cost effective manner. One common interpretation of Capacity Management is described in… …   Wikipedia

  • Capacity building — often refers to assistance which is provided to entities, usually developing country societies, which have a need to develop a certain skill or competence, or for general upgrading of performance ability. Most capacity is built by societies… …   Wikipedia

  • «Черновое» (укрупненное) планирование мощностей (ROUGH-CUT CAPACITY PLANNING, RCCP)  — Процесс преобразования объемно календарного плана на основе потребности в ключевых ресурсах, часто включая трудозатраты, оборудование, складское пространство, потенциал поставщиков и, в некоторых случаях, денежные средства. Для каждого ключевого… …   Словарь терминов по управленческому учету

  • Capacity Requirements Planning - CRP — An accounting method used to determine the available production capacity of a company. Capacity requirement planning first assesses the schedule of production that has been planned upon by the company. Then it analyzes the company s actual… …   Investment dictionary

  • Planning of the September 11 attacks — BackgroundAl Qaeda s origins date back to 1979 when the Soviet Union invaded Afghanistan.cite book |author=Gunaratna, Ronan |title=Inside Al Qaeda |year=2002 |publisher=Berkley Books] Soon after the invasion, Osama bin Laden traveled to… …   Wikipedia

  • capacity requirements plan — CRP Part of the second phase of material requirements planning, which produces daily or weekly estimates of the workload on key machines and processes in each department of a plant. This enables proactive adjustment of capacity to be made, if… …   Big dictionary of business and management

  • Manufacturing resource planning — (or MRP2) Around 1980, over frequent changes in sales forecasts, entailing continual readjustments in production, as well as the unsuitability of the parameters fixed by the system, led MRP (Material Requirement Planning) to evolve into a new… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”