Dead and live loads

Dead and live loads

Dead and Live loads are terms used in mechanical and structural engineering, especially where analysis of real world objects is required. A 'load' refers to any type of force exerted on an object, which may be in the form of a 'weight' (gravitational force), a pressure, or anything which affects the object in question.

Dead loads

Dead loads are weights of material, equipment or components that are relatively constant throughout the structure's life. Permanent loads are a wider category which includes dead loads but also includes forces set up by irreversible changes in a structure's constraints - for example, loads due to settlement, the secondary effects of prestress or due to shrinkage and creep in concrete.

Also, Dead Loads are not limited to walls, floors, roofs, ceilings, stairways, built-in partitions, finishes, cladding and other similarly incorporated architectural and structural items, and fixed services equipment, including the weight of cranes. All dead loads are considered permanent loads. [2006 International Building Code Section 1602.1.]

Live loads

Live loads, sometimes referred to as probablistic load include all the forces that are variable within the object's normal operation cycle. Using the staircase example the live load would be considered to be -
*Pressure of feet on the stair treads (variable depending on usage and size)
*Wind load (if the staircase happens to be outside)

Live loads do not include construction or environmental loads such as:
*Wind load
*Snow load
*Rain load
*Earthquake load
*Flood load
*Dead load [2006 International Building Code Section 1602.1.]

Live loads (Roof) produced (1) during maintenance by workers, equipment and materials; and (2) during the life of the structure by movable objects such as planters and by people. [2006 International Building Code Section 1602.1.]

Real world usage

The reason for splitting loads into these categories is not always apparent, and in terms of the actual load on the object there is no difference between dead or live loading. For the most part, the split occurs for use in safety calculations or ease of analysis on complex models.

When considering the feasibility of a structure, safety always takes precedent and because of this, governing bodies around the world have regulations to which structures have to adhere. Using the example of the staircase, if it was intended for use in the UK it would have to follow British and European Standards
*BS 4592 - Industrial type flooring and stair treads
*BS 5395 - Code of practice for the design of straight stairs
*Other standards specific to the application (e.g. BS 14122-3:2001 - Permanent means of access to machinery. Stairways, stepladders and guard-rails)

Within these standards a safety factor is usually determined where the structure should be able to withstand a certain force above the maximum expected load. Once again using the staircase example, assuming it is an indoor medium-usage industrial staircase the current safety factor would be 1.4 times the maximum stress imposed by the dead load and 1.6 times the maximum stress imposed by the live load. The reason for the disparity between values, and thus the reason the loads are initially categorised as dead or live is because while it is not unreasonable to expect a large number of people ascending the staircase at once (or the wind speed increasing, snowfall or any other live load increase), it is less likely that the structure will experience much change in its permanent load. The same can be said of many structures and so it is convenient to assess loading based on its application.

Calculating combined loads

It is worth noting that on first inspection it seems you should find the maximum stress for each of dead and live, factor them and add them together. This will give you a massively overestimated stress result. The combination needs to be applied with great care and almost exclusively programmatically because you may only combine two stress results at the same point. Since the maximum stress is very rarely at the same place in a structure for dead and live it may well be the case that the overall increase is a fraction of the addition of the two maximum stresses and in a completely different position two either of the two original maximums. To clarify, take the staircase analysis. The maximum stress under dead load appears at the foot of a support beam and it is 80 Nmm-2, at this point the stress from the live load is 5 Nmm-2. The maximum stress under live load is 60 Nmm-2 and appears at the corner of the second stairtread where the dead load stress is 30 Nmm-2. At a third point the stresses from both dead and live are 50 Nmm-2. Given these figures you can see that the combined load cases for each point would be:

:1. 80 x 1.4 + 5 x 1.6 = 120:2. 30 x 1.4 + 60 x 1.6 = 138:3. 50 x 1.4 + 50 x 1.6 = 150

As you can see the maximum combined stress appears away from both the original maxima but is still well under the 275 Nmm-2 yield point of the structural steel this staircase is made of so in this case we could say that the structure is safe.

ee also

* The Hotel New World disaster was caused by a miscalculation of the dead load of the building.
* The Hyatt Regency walkway collapse was caused by flawed dead and live load support.

References

External links

*Luebkeman, Chris H., and Donald Peting "Lecture 17: Primary Loads". University of Oregon. 1996 [http://darkwing.uoregon.edu/~struct/courseware/461/461_lectures/461_lecture17/461_lecture17.html]
*Fisette, Paul, and the American Wood Council. "Understanding Loads and Using Span Tables". 1997. [http://www.awc.org/technical/spantables/tutorial.htm]


Wikimedia Foundation. 2010.

Игры ⚽ Поможем сделать НИР

Look at other dictionaries:

  • Skyscraper design and construction — Skyscrapers are tall, internally supported structures where the majority of load bearing structure, outside of that providing structural support for dead load is specifically designed to provide for large free spaces between supporting elements… …   Wikipedia

  • Durrus and District History 1700-1900 — Durrus is an area of West Cork in Ireland. For earlier history, see Durrus and District History. For later history, see Durrus and District History Modern. Contents 1 1700 1800 1.1 Indictment of Priests 1714 2 Irish Famine of 1740 41 …   Wikipedia

  • Fly system — Fly loft of the Theater Bielefeld in Germany A fly system, flying system or theatrical rigging system, is a system of lines (e.g. ropes), blocks (pulleys), counterweights and related devices within a theatre that enable a stage crew to quickly,… …   Wikipedia

  • Shear and moment diagram — Shear and bending moment diagrams are analytical tools used in conjunction with structural analysis to help perform structural design by determining the value of shear force and bending moment at a given point of an element. Using these diagrams… …   Wikipedia

  • Shear and moment diagrams — Shear and bending moment diagrams are analytical tools used in conjunction with structural analysis to help perform structural design by determining the value of shear force and bending moment at a given point of an element. Using these diagrams… …   Wikipedia

  • Air Farce Live — For the comedy album of the same name, see Air Farce Live (album). Air Farce Live Format Comedy Directed by Perry Rosemond …   Wikipedia

  • Durrus and District History Modern — Durrus is an area of West Cork in Ireland. For earlier history, see Durrus and District History1900 2000 James Gilhooley M.P. and Elections 1910James Gilhooley MP (he had been a merchant in Bantry, and was jailed on a number of occaasions under… …   Wikipedia

  • Business and Industry Review — ▪ 1999 Introduction Overview        Annual Average Rates of Growth of Manufacturing Output, 1980 97, Table Pattern of Output, 1994 97, Table Index Numbers of Production, Employment, and Productivity in Manufacturing Industries, Table (For Annual… …   Universalium

  • Opening of the Liverpool and Manchester Railway — The Duke of Wellington s train and other locomotives being readied for departure from Liverpool, 15 September 1830 The opening of the Liverpool and Manchester Railway (L M) took place on 15 September 1830 …   Wikipedia

  • List of United States Marine Corps acronyms and expressions — This is a list of acronyms, expressions, euphemisms, jargon, military slang, and sayings in common or formerly common use in the United States Marine Corps. Many of the words or phrases have varying levels of acceptance among different units or… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”