Value engineering

Value engineering

Value engineering is a systematic method to improve the "value" of goods and services by using an examination of function. Value, as defined, is the ratio of function to cost. Value can therefore be increased by either improving the function or reducing the cost. It is a primary tenet of value engineering that basic functions be preserved and not be reduced as a consequence of pursuing value improvements. [ [http://www.value-eng.org/pdf_docs/monographs/vmstd.pdf Value Methodology Standard ] ]

In the United States, value engineering is specifically spelled out in Public Law 104-106, which states “Each executive agency shall establish and maintain cost-effective value engineering procedures and processes." [ [http://oecm.energy.gov/Portals/2/PL104_106.pdf Text of Law Requiring Value Engineering in Executive Agencies ] ]

Value engineering is sometimes taught within the project management or industrial engineering body of knowledge as a technique in which the value of a system’s outputs is optimized by crafting a mix of performance (function) and costs. In most cases this practice identifies and removes unnecessary expenditures, thereby increasing the value for the manufacturer and/or their customers.

VE follows a structured thought process that is based exclusively on "function", i.e. what something "does" not what it is. For example a screw driver that is being used to stir a can of paint has a "function" of mixing the contents of a paint can and not the original connotation of securing a screw into a screw-hole. In value engineering "functions" are always described in a two word abridgment of an active verb and measurable noun (what is being done - the verb - and what it is being done to - the noun) and to do so in the most non-prescriptive way possible. In the screw driver and can of paint example, the most basic function would be "blend liquid" which is less prescriptive than "stir paint" which can be seen to limit the action (by stirring) and to limit the application (only considers paint.) This is the basis of what value engineering refers to as "function analysis". []

Value engineering uses rational logic (a unique "how" - "why" questioning technique) and the analysis of function to identify relationships that increase value. It is considered a quantitative method similar to the scientific method, which focuses on hypothesis - conclusion to test relationships, and operations research, which uses model building to identify predictive relationships.

Value engineering (VE) is also referred to as or "value management" or "value methodology" (VM), and "value analysis" (VA) [ [http://www.value-eng.org SAVE International - Value Engineering, Value Analysis, Value Management and Value Methodology ] ] . VE is above all a structured problem solving process based on function analysis—understanding something with such clarity that it can be described in two words, the active verb and measurable noun abridgement. For example, the function of a pencil is to "make marks". This then facilitates considering what else can make marks. From a spray can, lipstick, a diamond on glass to a stick in the sand, one can then clearly decide upon which alternative solution is most appropriate.

The Origins of Value Engineering

Value engineering began at General Electric Co. during World War II. Because of the war, there were shortages of skilled labour, raw materials, and component parts. Lawrence Miles and Harry Erlicher at G.E. looked for acceptable substitutes. They noticed that these substitutions often reduced costs, improved the product, or both. What started out as an accident of necessity was turned into a systematic process. They called their technique “value analysis”.

The Job Plan

Value engineering is often done by systematically following a multi-stage Job Plan. Larry Miles' original system was a six-step procedure which he called the Value Analysis Job Plan. Others have varied the Job Plan to fit their constraints. Depending on the application, there may be four, five, six, or more stages. One modern version has the following eight steps:

# PREPARATION
# INFORMATION
# ANALYSIS
# CREATION
# EVALUATION
# DEVELOPMENT
# PRESENTATION
# FOLLOW-UP

Four basic steps in the Job Plan are:

* Information gathering - This asks what the requirements are for the object. Function analysis, an important technique in value engineering, is usually done in this initial stage. It tries to determine what functions or performance characteristics are important. It asks questions like; What does the object do? What must it do? What should it do? What could it do? What must it not do?
* Alternative generation (Creation) - In this stage value engineers ask; What are the various alternative ways of meeting requirements? What else will perform the desired function?
* Evaluation - In this stage all the alternatives are assessed by evaluating how well they meet the required functions and how great will the cost savings be.
* Presentation - In the final stage, the best alternative will be chosen and presented to the client for final decision.

How it works

VE follows a structured thought process to evaluate options.

Gather information

1.What is being done now?:Who is doing it?:What could it do?:What must it not do?

Measure

2.How will the alternatives be measured?:What are the alternate ways of meeting requirements?:What else can perform the desired function?

Analyze

3.What must be done?:What does it cost?

Generate

4.What else will do the job?

Evaluate

5. Which Ideas are the best?

6. Develop and expand ideas :What are the impacts? :What is the cost? :What is the performance?

7. Present ideas :Sell alternatives

See also

*Cost
*Cost engineering
*Cost overrun
*ISO 15686

References

5. Cooper, R. und Slagmulder, R. (1997): Target Costing and Value Engineering.

External links

* [http://www.wisc.edu/wendt/miles/index.html Lawrence D. Miles Value Engineering Reference Center: Wendt Library]
* [http://www.value-eng.org/ SAVE International] - Value engineering society
* [http://www.wertanalyse.com/ful/wertanalyse_links.htm wertanalyse.com] - Many links regarding VE organisations and publications
* [http://www.scav-csva.org/ The Canadian Society of Value Analysis] - Value Engineering in Canada
* [http://www.vecourse.com/history.htm Value Engineering’s History in Construction] - American Institute of Architects - AIA


Wikimedia Foundation. 2010.

Игры ⚽ Нужно решить контрольную?

Look at other dictionaries:

  • value engineering — UK US noun [U] (also value analysis [C or U]) PRODUCTION, ECONOMICS ► the process of reducing the cost of producing a product without reducing its quality or how effective it is: »Substantial value engineering had to be done to control costs …   Financial and business terms

  • value engineering — value engineering, 1. the analysis as of a product or process to determine the least expensive method of design and production. 2. the modification as of a product or process as a result of such an analysis …   Useful english dictionary

  • Value Engineering — A systematic and organized approach to provide the necessary functions in a project at the lowest cost. Value engineering promotes the substitution of materials and methods with less expensive alternatives, without sacrificing functionality. It… …   Investment dictionary

  • value engineering — / vælju: endʒɪˌnɪərɪŋ/ noun analysis by a producer of all aspects of a product at the design stage to determine how it could be made at minimum cost ● Value engineering allows very economical production and competitive prices at every stage in… …   Marketing dictionary in english

  • value engineering — Designing a product to eliminate any costs that do not contribute to the value of the product, i. e. the performance (or some other attribute) that leads the customer to purchase the product in preference to other similar products …   Big dictionary of business and management

  • value engineering — An organized effort directed at analyzing the function of Department of Defense systems, equipment, facilities, procedures, and supplies for the purpose of achieving the required function at the lowest total cost of effective ownership,… …   Military dictionary

  • Value Engineering — Bezeichnung für die ⇡ Wertanalyse im Hinblick auf ein in der Entwicklung befindliches Produkt mit dem Ziel der Kostenvermeidung …   Lexikon der Economics

  • engineering — en‧gi‧neer‧ing [ˌendʒˈnɪərɪŋ ǁ ˈnɪr ] noun [uncountable] MANUFACTURING the profession and activity of designing the way roads, bridges, machines, electrical equipment etc are built: • Most students specialize in one single branch of engineering …   Financial and business terms

  • value analysis — UK US noun [C or U] PRODUCTION, ECONOMICS ► VALUE ENGINEERING(Cf. ↑value engineering) …   Financial and business terms

  • Engineering geology — is the application of the geologic sciences to engineering practice for the purpose of assuring that the geologic factors affecting the location, design, construction, operation and maintenance of engineering works are recognized and adequately… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”