East West MRT Line

East West MRT Line
     East West MRT Line
东西地铁线
கிழக்கு மேற்கு எம்ஆர்டி வழி

The East West Line is coloured green on system maps.
Overview
Type Rapid transit
System Mass Rapid Transit (Singapore)
Status Operational
Termini Pasir Ris
Joo Koon
Changi Airport
Tanah Merah
Stations 35
Services 2
Operation
Opened 12 December 1987
Owner Land Transport Authority
Operator(s) SMRT Trains
Rolling stock C151, C151A, C651, C751B
Technical
Line length 49.2 km (30.6 mi)
Track gauge 1,435 mm (4 ft 8 12 in) Standard gauge
Electrification Third rail

The East West Line (EWL) was the 2nd Mass Rapid Transit line in Singapore. The line is currently 49.2 km long with 35 stations (4 to be constructed by 2016), making it the longest MRT line in Singapore. It takes about 63 minutes to travel from one end to the other. The line is coloured green on MRT system maps and is operated by SMRT Corporation.

As the name implies, the line connects central Singapore to both western and eastern parts of the island, with an additional branch to Changi Airport from Tanah Merah. Cross-platform transfer to the North South Line is provided at Jurong East, City Hall and Raffles Place stations while transfer to the North East Line at Outram Park station is possible via a linkway. For Circle Line at Paya Lebar and Buona Vista via a underpass and linkway. The future Downtown Line will interchange with the East West Line at Bugis, Tampines and Expo.

Contents

History

Initial system

2nd phase of development

Future Extensions

The East West Line Tuas West Extension is a fully elevated 8 kilometre westward extension from Joo Koon Station and comprises 4 stations and a depot near the Tuas Checkpoint. The easternmost station along this extension will serve as an interchange station for the future Tuas South Extension. This interchange station will have 2 island platforms and 4 tracks. The extension will commence passenger service by 2016.

The East West Line Tuas South Extension is a fully elevated 6 kilometre southward extension from the easternmost station along the Tuas West Extension and comprises 2 stations. This extension will be built by 2025.

Stations

Station Number Station Name Interchange/Notes
EW1 Pasir Ris
EW2 / DT32 Tampines Downtown Line (future)
EW3 Simei
EW4 Tanah Merah East West Line (Changi Airport Extension); cross-platform transfer available between Changi Airport-bound and both Pasir Ris-bound and Joo Koon-bound trains
Platform A - Pasir Ris-bound
Platform B - Joo Koon-bound
Platform C/D (Middle Platform) - Changi Airport-bound
EW5 Bedok
EW6 Kembangan
EW7 Eunos
EW8 / CC9 Paya Lebar Circle Line
EW9 Aljunied Terminal of East West Line Lunch Time Xpress train service
EW10 Kallang
EW11 Lavender
EW12 / DT14 Bugis Downtown Line (under construction)
EW13 / NS25 City Hall North South Line; cross-platform transfer available between Pasir Ris-bound and Marina Bay-bound trains, and between Joo Koon-bound and Jurong East-bound trains
EW14 / NS26 Raffles Place North South Line; cross-platform transfer available between Pasir Ris-bound and Jurong East-bound trains, and between Joo Koon-bound and Marina Bay-bound trains
EW15 Tanjong Pagar
EW16 / NE3 Outram Park North East Line
Terminal of East West Line Lunch Time Xpress train service
EW17 Tiong Bahru
EW18 Redhill
EW19 Queenstown
EW20 Commonwealth
EW21 / CC22 Buona Vista Circle Line
EW22 Dover
EW23 Clementi
EW24 / NS1 Jurong East North South Line; cross-platform transfer available between Marina Bay-bound and both Pasir Ris-bound and Joo Koon-bound trains
Platform A , D/E - Marina Bay-bound
Platform B/C - Pasir Ris-bound
Platform F - Joo Koon-bound
Platform A and B only open during weekdays morning peak hours from 7am-9am
EW25 Chinese Garden
EW26 Lakeside
EW27 Boon Lay
EW28 Pioneer
EW29 Joo Koon
EW30 Tuas Under planning
EW31 Tuas Crescent Under planning
EW32 Tuas West Under planning
EW33 Tuas Link Under planning

Changi Airport Extension

Station Number Station Name Interchange
EW4 Tanah Merah Interchange; cross-platform transfer available between Changi Airport-bound and both Pasir Ris-bound and Joo Koon-bound trains
Platform C/D (Middle Platform) - Changi Airport-bound
Platform A - Pasir Ris-bound
Platform B - Joo Koon-bound
CG1/DT35 Expo Downtown Line (future)
Platform A - Changi Airport-bound
Platform B - Tanah Merah-bound
CG2 Changi Airport Platform A/B - Tanah Merah-bound

Note: SMRT had used to operate the branch sector of Tanah Merah to Changi Airport as a through line from Boon Lay (Boon Lay - Changi Airport via Tanah Merah, Joo Koon was not built at that time) since the opening of Changi Airport station on 2002 until July 22, 2003. This was due to low demand on Expo and Changi Airport that made SMRT revert this sector as shuttle service.[1] Similar to the through service, the interval of trains remained as 12 minutes per train.

Rolling stock

Four batches of rolling stock are in service on the line, i.e. the Kawasaki Heavy Industries C151, the Siemens C651, Kawasaki Heavy Industries & Nippon Sharyo C751B and the Kawasaki Heavy Industries C151A. These trains operate from the two depots along the East West Line, the Ulu Pandan Depot near Jurong East MRT Station and the Changi Depot after Tanah Merah MRT Station. Some trains come from the North South Line when they cross the tracks at Jurong East to head to Pasir Ris via the East West Line on the early morning of weekdays. Currently, there are 10 Kawasaki Heavy Industries C151A in service as of October 2011 and 12 more will be in service by December 2011.

Short Trip Services

Short trip services operate during weekday lunchtime periods between Outram Park and Aljunied to cater to greater demand on this stretch. The service is from 12pm - 2pm. [2]

References

External links


Wikimedia Foundation. 2010.

Игры ⚽ Поможем сделать НИР

Look at other dictionaries:

  • North South MRT Line —      North South MRT Line 南北地铁线 வடக்கு தெற்கு எம்ஆர்டி வழி The North South Line is coloured red on system maps …   Wikipedia

  • Downtown MRT Line —      Downtown MRT Line 滨海市区地铁线 The Downtown Line is coloured blue on system maps. Overview …   Wikipedia

  • North East MRT Line — North East Line redirects here. For the railway line in Australia, see North East railway line.      North East MRT Line 东北地铁线 வடக்கு கிழக்கு எம்ஆர்டி வழி …   Wikipedia

  • Eastern Region MRT Line — Infobox rail line box width = auto name = Eastern Region Line color = SMRT color|Eastern Region logo = logo width = image width = caption = type = Rapid transit system = Mass Rapid Transit (Singapore) status = Planning locale = start = end =… …   Wikipedia

  • Circle MRT Line —      Circle MRT Line 地铁环线 The Circle Line is coloured orange on system maps. Overview …   Wikipedia

  • Clementi MRT Station —  EW23  Clementi MRT Station 金文泰地铁站 கிளிமெண்டி Stesen MRT Clementi Rapid transit Platform level of the Clementi MRT Station …   Wikipedia

  • Jurong East MRT Station — Infobox Station name=Jurong East MRT Station 裕廊东地铁站 ஜூரோங் கிழக்கு type=Rapid transit image size=300 image caption=North South Line platform of NS1/EW24 Jurong East Station address=10 Jurong East Street 12 Singapore 609690… …   Wikipedia

  • Tampines MRT Station — Infobox Station name=Tampines MRT Station 淡滨尼地铁站 தெம்பினிஸ் type=Rapid transit image size=300 image caption=The exterior of EW2 Tampines MRT Station. address=20 Tampines Central 1 Singapore 529538 coordinates= coord|1.211113|103.564282 line=East… …   Wikipedia

  • Lavender MRT Station — Infobox Station name=Lavender MRT Station 劳明达地铁站 லவண்டர் type=Rapid transit image size=300 image caption=Platform level of the Lavender MRT Station address=50 Kallang Road Singapore 208699 coordinates= coord|1.182580|103.514683 line=East West… …   Wikipedia

  • Pasir Ris MRT Station — Infobox Station name=Pasir Ris MRT Station 巴西立地铁站 பாசிர் ரிஸ் type=Rapid transit image size=300 image caption=Pasir Ris MRT Station, platform level. address=10 Pasir Ris Central Singapore 519634 coordinates= coord|1.222068|103.565773 line=East… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”