KANUPP Karachi Nuclear Power Plant is located at Karachi, Sindh, Pakistan.

KANUPP, Karachi is a single unit CANDU PHWR with a total gross capacity of 137 MW. It is located at Paradise Point on the arid Arabian Sea Coast, about 15 miles to the west of Karachi. The Shaheed Zulfiqar Ali Bhutto Established of Karachi Nuclear Plant November 28,1972. KANUPP is part of Karachi Nuclear Power Complex (KNPC) and is owned and operated by Pakistan Atomic Energy Commission (PAEC).

The KANUPP reactor site is on the Arabian Sea coast, about 11 miles (17.7 km) west of Karachi.

The Karachi Nuclear Power Plant (KANUPP) has a heavy water moderated and cooled natural uranium fuelled, horizontal pressure tube reactor. Other distinguishing features are once-through, on-power bidirectional fuelling, reactor shutdown by moderator dump, and a reactor building designed for total containment of any pressure or activity resulting from a credible accident. The gross plant rating is 137 MWe and the corresponding net output is 125 MWe. The Reactor Building contains the entire reactor system and auxiliaries, and consists of a pre-stressed concrete cylindrical wall, a hemispherical segmental dome of pre-stressed concrete, and a concrete base slab. The Turbine Building houses the turbine-generator and auxiliaries, some process water equipment, electrical distribution equipment, and the control room. The building is a reinforced concrete frame and block structure. The reactor consists of a tubed calandria vessel of austenitic stainless steel, which contains the heavy water moderator / reflector and 208 coolant tube assemblies. The moderator system consists of the calandria, coolers, pumps and purification system in the heavy water circuit, and control valves, dump valves and helium blowers in the helium circuit. The fuel is natural uranium in the form of sintered uranium dioxide pellets sheathed in thin zirconium alloy tubes to form solid fuel elements about 19.1 inches (48.53 cm) long by 0.6 inches (1.4 cm) diameter. KANUPP came into commercial operation in 1972 and after completing its 30 years of design life it was shutdown on December 06,2002. At present the plant is undergoing several safety up gradations for operation beyond design life. On the request of KANUPP, PNRA allowed the plant to operate at 50 MW for the interim period.

ee also

*Nuclear power in Pakistan

External links

* [http://www.paec.gov.pk/kanupp/kanupp-index.htm Karachi Nuclear Power Plant]


Wikimedia Foundation. 2010.

Игры ⚽ Поможем сделать НИР

Look at other dictionaries:

  • Kanupp — La Centrale nucléaire de KANUPP (*) est située au bord de la mer d Oman à environ 25 km à l ouest de Karachi dans la province de Sindh au Pakistan. (*) Nota : pour KArachi NUclear Power Plant Description Cette centrale comporte un réacteur à …   Wikipédia en Français

  • KANUPP — f1 Kernkraftwerk Karatschi DEC …   Deutsch Wikipedia

  • KANUPP — 24°50′42″N 66°47′16″E / 24.845, 66.78778 La Centrale nucléaire de KANUPP (*) (pour KArachi NUclear Power Plant) est située au bord de la …   Wikipédia en Français

  • KANUPP Institute of Nuclear Power Engineering — The KANUPP Institute of Nuclear Power Engineering (KINPOE), is located at Karachi Nuclear Power Complex near Paradise Point in Karachi, Sindh, Pakistan. KINPOE has been established by the Pakistan Atomic Energy Commission (PAEC), to develop… …   Wikipedia

  • KANUPP — Karachi Nuclear Power Plant (Academic & Science » Physics) …   Abbreviations dictionary

  • Nuclear power in Pakistan — …   Wikipedia

  • Kernkraftwerk Karachi — f1 Kernkraftwerk Karatschi DEC …   Deutsch Wikipedia

  • Kernkraftwerk Karatschi — f1 Kernkraftwerk Karatschi Bild gesucht  BW Lage …   Deutsch Wikipedia

  • Munir Ahmad Khan — (1926 1999), HI. Born May 26, 1926( …   Wikipedia

  • Pakistan and weapons of mass destruction — Pakistan Nuclear program start date January 20, 1972 First nuclear weapon test May 28, 1998 First fusion weap …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”