STS-106

STS-106

Infobox Space mission
mission_name = STS-106
insignia = Sts-106-patch.png shuttle = Atlantis
launch_pad = 39-B
launch = September 8, 2000, 8:45:47 a.m EDT
landing = September 19, 2000, 3:56 a.m. EDT, KSC, Runway 15
duration = 10 days, 19 hours, 12 minutes, 15 seconds
altitude = 173 nautical miles (320 km)
inclination = 51.6 degrees
distance = 4.9 million miles (7.9 million km)
crew_photo = STS-106 crew.jpg
crew_caption =
previous = STS-101
next = STS-92

STS-106 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle " Atlantis".

Crew

* Terrence W. Wilcutt (4), Commander
* Scott D. Altman (2), Pilot
* Daniel C. Burbank (1), Mission Specialist 3
* Edward T. Lu (2), Mission Specialist 1
* Richard A. Mastracchio (1), Mission Specialist 2
* Yuri Malenchenko (2), Mission Specialist 4 - RUS RKA
* Boris Morukov (1), Mission Specialist 5 - RUS RKA

Number in parentheses indicates number of spaceflights by each individual prior to and including this mission.

Mission parameters

*Mass:
**"Orbiter Liftoff:" 254,103 lb (115,259 kg)
**"Orbiter Landing:" 221,276 lb (100,369 kg)
**"Payload:" 22,529 lb (10,219 kg)
*Perigee: 233 mi (375 km)
*Apogee: 240 mi (386 km)
*Inclination: 51.6°
*Period: 92.2 min

Docking with ISS

*Docked: September 10, 2000, 05:51:25 UTC
*Undocked: September 18, 2000, 03:46:00 UTC
*Time Docked: 7 days, 21 h, 54 min, 35 s

pace walks

* " Lu and Malenchenko " - EVA 1
*EVA 1 Start: September 11, 2000 - 04:47 UTC
*EVA 1 End: September 11, - 11:01 UTC
*Duration: 6 hours, 14 minutes

Mission highlights

Space Station assembly flight ISS-2A.2b utilized the SPACEHAB Double Module and the Integrated Cargo Carrier (ICC) to bring supplies to the station. The mission also included two spacewalks.

Veteran Astronaut Terrence Wilcutt (Col., USMC) lead the seven-man crew, commanding his second Shuttle flight and making his fourth trip into space. During the planned 11-day mission, Wilcutt and his crew mates spent a week inside the ISS unloading supplies from both a double SPACEHAB cargo module in the rear of Atlantis's cargo bay and from a Russian Progress M-1 resupply craft docked to the aft end of the Zvezda Service Module. Zvezda, which linked up to the ISS on July 26, served as the early living quarters for the station and is the cornerstone of the Russian contribution to the ISS.

The goal of the flight was to prepare Zvezda for the arrival of the first residents, or Expedition, crew later in the fall of 2000 and the start of a permanent human presence on the new outpost. That crew, made up of Expedition Commander Bill Shepherd, Soyuz Commander Yuri Gidzenko and Flight Engineer Sergei Krikalev, launched on October 31, 2000 in a Soyuz capsule from the Baikonur Cosmodrome in Kazakhstan for a four-month "shakedown" mission aboard the ISS.On flight day three, Dr. Ed Lu and Yuri Malenchenko (Col., Russian Air Force), who were both making their second flights into space, conducted a 6 hour and 14 minute space walk. The spacewalk's objective focused on routing and connecting nine power, data and communications cables between the Zvezda module and the other Russian-built module, Zarya, as well as installing the six-foot-long magnetometer. The magnetometer will serve as a three-dimensional compass designed to minimize Zvezda propellant usage by relaying information to the module's computers regarding its orientation relative to the Earth.

Lu and Malenchenko used tethers and handrails along the ISS to make their way to a point more than 100 feet above the cargo bay, the farthest any tethered spacewalker has ventured outside the shuttle. They completed this with the assistance of their crewmates Burbank and Mastracchio who deftly maneuvered them around with the robotic arm. This spacewalk celebrates the sixth spacewalk in support of the station assembly and the 50th spacewalk in space shuttle history. Also this was the second joint U.S.-Russian space walk outside a Space Shuttle, following on the work conducted by Astronaut Scott Parazynski and Cosmonaut Vladimir Titov outside "Atlantis" while docked to the Mir Space Station during the STS-86 mission in October 1997. Lu, designated EV 1, wore the space suit marked by red stripes, while Malenchenko, EV 2, wore the pure white suit. This was Lu's first space walk, while Malenchenko had conducted a pair of space walks totaling 12 hours during his four-month stay aboard Mir in 1994. Dan Burbank (Lt. Cmdr, USCG), who was a spaceflight rookie, served as the space walk choreographer.

Mission Specialist Rick Mastracchio, also a spaceflight novice, was the prime robot arm operator for the mission, using the Canadian-built arm to move Lu and Malenchenko around the ISS as they conducted their assembly work. Mastracchio is backed up on arm operations by Pilot Scott Altman (Cmdr., USN), making his second flight into space.

The final member of the crew was Russian Cosmonaut Dr. Boris Morukov, making his first flight into space. Morukov was responsible for unloading supplies from the Progress vehicle during the docked phase of the flight.

On flight day four the crew entered the International Space Station through Pressurized Mating Adapter-2 (PMA-2) to begin the transfer operations of more than three tons of hardware and supplies. Atlantis' crew was the first to see the interior of the Russian Zvezda service module since it was launched from the Baikonur Cosmodrome in July. Additionally, a reboost was performed using the orbiter's Reaction Control System (RCS) to place the station in a higher orbit.

Transfer of supplies and maintenance tasks continued well into the fifth day, while orbiter consumables remained above the required levels allowing managers to extend the mission one additional day.

Activities on flight day five included the installation of three batteries inside Zvezda. In order to reduce the weight for launch, Zvezda was launched with only five of its eight batteries in place.

Lu and Malenchenko spent much of flight day seven installing voltage and current stabilizers in Zvezda. Components of the Elektron system, equipment sent into orbit to separate water into oxygen and hydrogen, were installed and will be activated after the first crew arrives.

The crew transferred more than 6,000 pounds of material - including six 100 pound bags of water, all of the food for the first resident crew, office supplies, onboard environmental supplies, a vacuum cleaner and a computer and monitor - to the interior of the station.

The astronauts spent a total of 5 days, 9 hours and 21 minutes inside the station before closing the hatch on the orbiting outpost. Wilcutt and Altman commanded a series of four altitude boosts to place the station in an orbit of approximately 241 by 233 statute miles, raising the average altitude by convert|14|mi|km|0. After spending 7 days, 21 hours and 54 minutes linked to the station, Atlantis undocked at 11:46 p.m. EDT as Wilcutt and Altman fired Atlantis' jets to move to a distance of about 450 feet for a double-loop flyaround.

Commander Terry Wilcutt guided Atlantis to a landing at 2:56 a.m. Central time, wrapping up a 4.9 million mile mission in which more than three tons of equipment were delivered to the international outpost. Wilcutt and his crewmates, Pilot Scott Altman and Mission Specialists Ed Lu, Rick Mastracchio, Dan Burbank, Yuri Malenchenko and Boris Morukov completed the 23rd consecutive landing of a shuttle at the Florida spaceport, and the 30th landing of a shuttle at the Cape in the last 31 flights.

ee also

* Space science
* Space shuttle
* List of space shuttle missions
* List of human spaceflights chronologically
* List of ISS spacewalks
* List of spacewalks

External links

* [http://science.ksc.nasa.gov/shuttle/missions/sts-106/mission-sts-106.html NASA mission summary]
* [http://www.nss.org/resources/library/shuttlevideos/shuttle99.htm STS-106 Video Highlights]


Wikimedia Foundation. 2010.

Игры ⚽ Нужно решить контрольную?

Look at other dictionaries:

  • Sts-106 — Données de la mission Vaisseau Navette spatiale Atlantis Équipage 7 hommes Da …   Wikipédia en Français

  • STS-106 — Données de la mission Vaisseau Navette spatiale Atlantis Équipage 7 hommes Date de lancement 8 septembre 2000 à 12:45:47 UTC …   Wikipédia en Français

  • STS-106 — Эмблема Полётные данные корабля Название корабля …   Википедия

  • STS-106 — Saltar a navegación, búsqueda Programa del transbordador espacial Insignia de la misión Datos de la misión Misión: STS 106 …   Wikipedia Español

  • STS-106 — Missionsemblem Missionsdaten Mission: STS 106 NSSDC ID: 2000 053A Space Shuttle …   Deutsch Wikipedia

  • Атлантис STS-106 — «Атлантис» STS 101 четвертый полёт шаттла по программе Международной космической станции. В грузовом отсеке шаттла располагался двойной транспортный модуль «Спейсхэб», в котором были размещены материалы и оборудование, доставляемое на станцию.… …   Википедия

  • STS-101 — Données de la mission Vaisseau Navette spatiale Atlantis Équipage 5 hommes et 2 femmes Date de lancement 19 mai 2000 à 10:11:10 UTC …   Wikipédia en Français

  • STS-92 — Données de la mission Vaisseau Navette spatiale Discovery Équipage 6 hommes et 1 femme Date de lancement 12 octobre 2000 à 00:17:00 GMT …   Wikipédia en Français

  • Sts-101 — Données de la mission Vaisseau Navette spatiale Atlantis Équipage 5 hommes et 2 femmes …   Wikipédia en Français

  • Sts-92 — Données de la mission Vaisseau Navette spatiale Discovery Équipage 6 hommes et 1 femme …   Wikipédia en Français