Salt Waste Processing Facility

Salt Waste Processing Facility

The Salt Waste Processing Facility (SWPF) is a proposed nuclear waste treatment facility for the United States Department of Energy's Nuclear Reservation Savannah River Site in Aiken, South Carolina. It is being designed and constructed by the Parsons Corporation for treatment of nuclear salt waste and is expected to become operational in 2012-2013.

Background

The Savannah River Site (SRS) presently contains legacy nuclear waste from the production of nuclear materials between 1951 and 2002. The nuclear waste is stored in large (typically 1 million gallon nominal capacity) underground double walled storage tanks located in F-Area and H-Area tank farms.

Upon completion in 2013, the Salt Waste Processing Facility (SWPF) will be the cornerstone of the Savannah River Site (SRS) salt processing strategy. It is designed to be capable of processing 6 million gallons of salt solution per year. The waste currently in storage at SRS presently includes approximately 84 million gallons of salt solution that must be processed, of which 75 million gallons are projected to be processed through SWPF.

SWPF will use specific processes that have been developed and that will be the state-of-the-art methods to target the removal of Caesium-137, Strontium-90, and actinides from SRS salt wastes. SWPF will remove approximately 99.998% of the Caesium-137/Barium-137 (metastable) activity while also removing strontium and actinides (Ref 1).

Planned Deployment of SWPF Treatment Facility

About 33.8 million gallons of salt waste are currently stored in underground waste storage tanks at SRS. This waste, along with future salt waste forecast to be sent to the tank farms, will be processed through DDA, ARP/MCU, and the SWPF. DOE estimated inpreparing the Section 3116 Determination that an additional 41.3 Mgal of unconcentrated salt waste would have been received by the Tank Farms between December 1, 2004, and the completion of salt waste processing. After both liquid removal by processing through the Tank Farmevaporator systems and later additions of liquid for saltcake dissolution and chemistry adjustments required for processing, approximately 84 Mgal (5.9 Mgal existing salt waste through the DDA process, 1.0 Mgal future salt waste through the DDA process, 2.1 Mgalexisting and future salt waste through ARP/MCU, 69.1 Mgal existing salt waste through SWPF, and 5.9 Mgal future salt waste through SWPF) of salt solution will be processed by Interim Salt Processing and High Capacity Salt Processing resulting in approximately 168 Mgal of groutoutput from the Saltstone Production Facility to be disposed of in the Saltstone Disposal Facility. (DOE Amended Decision)

Planned Start Date Delayed

The start date for SWPF operations has been delayed (from 2009 to 2013) to allow for modification of the SWPF preliminary design to incorporate a higher degree of performance category (PC)in the confinement barriers necessary for worker protection during natural phenomena hazard events. The Defense Nuclear Facilities Safety Board initially identified concerns related to the PC designations of the SWPF in August, 2004. DOE agreed in November,2005, to modify the SWPF design after extensive analysis and review, resulting in an approximate two year delay in the planned startup of SWPF. DOE anticipates that it will continue to explore possible ways to improve the schedule for design and construction of the SWPF. It remains DOE's goal to complete processing of salt waste through theSWPF by 2019 although this date may need to be modified in the future. Despite this projected delay, DOE will not increase the quantity of waste (total curies) to be disposed of in the Saltstone Disposal Facility, nor increase the quantities (curies) processedwith interim processes or SWPF from those described here and in the Draft Section 3116 Determination for Salt Waste Disposal at the Savannah River Site and the Section 3116 Determination for Salt Waste Disposal at the Savannah River Site. Therefore, the datechange does not affect the analyses in the Section 3116 Determination for Salt Waste Disposal at the Savannah River Site,its supporting documents, or the Nuclear Regulatory Commission (NRC) consultation. The modifiedschedule is reflected in the Section 3116 Determination for Salt Waste Disposal at the Savannah River. However, the technical and programmatic documents that are referenced by the Section 3116Determination for Salt Waste Disposal at the Savannah River Site have not been updated to reflect this new date because the schedule change did not occur until after those documents were completed. (DOE Amended decision).

References

# [http://www.epa.gov/fedrgstr/EPA-IMPACT/2006/January/Day-24/i814.htm Draft Section 3116 Determination for Salt Waste Disposal at the Savannah River Site] (February 28, 2005)

ee also

* Nuclear fuel cycle
* MOX fuel

External links

* [http://www.srs.gov Official website of the Savannah River Site]
* [http://www.parsons.com/ Official website of Parsons Corporation]
* [http://energy.gov/index.htm Official website of the Department of Energy]


Wikimedia Foundation. 2010.

Игры ⚽ Поможем решить контрольную работу

Look at other dictionaries:

  • Radioactive waste — 2007 ISO radioactivity danger logo, designed in part for long term radioactive waste depositories which might survive into a far future time in which all knowledge of the meaning of present common radiation danger symbols and signs has been lost… …   Wikipedia

  • Savannah River Site — The Savannah River Site (SRS) is a nuclear materials processing center in the United States state of South Carolina, located on land in Aiken, Allendale and Barwnell Counties adjacent to the Savannah River 25 miles from Augusta, Georgia. It is… …   Wikipedia

  • Hazardous waste in the United States — Under United States environmental policy, a hazardous waste is a waste (usually a solid waste) that has the potential to:*cause, or significantly contribute to an increase in mortality or an increase in serious irreversible, or incapacitating… …   Wikipedia

  • Molten salt reactor — scheme. A molten salt reactor (MSR) is a type of nuclear fission reactor in which the primary coolant, or even the fuel itself is a molten salt mixture. MSRs run at higher temperatures than water cooled reactors for higher thermodynamic… …   Wikipedia

  • Molten-Salt Reactor Experiment — MSRE plant diagram The Molten Salt Reactor Experiment (MSRE) was an experimental molten salt reactor at the Oak Ridge National Laboratory (ORNL) researching this technology through the 1960s; constructed by 1964, it went critical in 1965 and was… …   Wikipedia

  • SWPF — abbr. Salt Waste Processing Facility …   Dictionary of abbreviations

  • environmental works — ▪ civil engineering Introduction       infrastructure that provides cities and towns with water supply, waste disposal, and pollution control services. They include extensive networks of reservoirs, pipelines, treatment systems, pumping stations …   Universalium

  • environment — environmental, adj. environmentally, adv. /en vuy reuhn meuhnt, vuy euhrn /, n. 1. the aggregate of surrounding things, conditions, or influences; surroundings; milieu. 2. Ecol. the air, water, minerals, organisms, and all other external factors… …   Universalium

  • Glossary of environmental science — This is a glossary of environmental science.Environmental science is the study of interactions among physical, chemical, and biological components of the environment. Environmental science provides an integrated, quantitative, and… …   Wikipedia

  • List of companies in the nuclear sector — Here is a list of all large companies which are active along the nuclear chain, from uranium mining, processing and enrichment, to the actual operating of nuclear power plant and waste processing. Company name Country of origin Category Brief… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”