Seven tiers of disaster recovery

Seven tiers of disaster recovery

The Seven Tiers of Disaster Recovery was originally defined by Share [http://www.share.org ] to help identify the various methods of recovering mission-critical computer systems as required to support business continuity.

Although the original known published concept dates back to the 1990’s, Business Continuity Planning (BCP) and Disaster Recovery Specialists today continue to use the 7-Tiers to illustrate continuity capabilities and costs at a very high level. The definitions for the various Tiers have been updated as technology has evolved in support of today's business requirements and their associated Recovery Time Objective (RTO) and Recovery Point Objective (RPO).

The seven tiers of business continuity solutions offer a simple method to define current service levels and associated risks.

Tier 0: No off-site data – Possibly no recovery

Businesses with a Tier 0 business continuity solution have no Business Continuity Plan. There is no saved information, no documentation, no backup hardware, and no contingency plan. The time necessary to recover in this instance is unpredictable. In fact, it may not be possible to recover at all. Tier 1: Data backup with no hot site

Businesses that use Tier 1 continuity solutions back up their data and send these backups to an off-site storage facility. The method of transporting these backups is often referred to as "PTAM" - the "Pick-up Truck Access Method." Depending on how often backups are created and shipped, these organizations must be prepared to accept several days to weeks of data loss, but their backups are secure off-site. However, this tier lacks the systems on which to restore data. Tier 2: Data backup with a hot site

Businesses using Tier 2 business continuity solutions make regular backups on tape. This is combined with an off-site facility and infrastructure (known as a hot site) in which to restore systems from those tapes in the event of a disaster. This solution will still result in the need to recreate several hours or even days worth of data, but the recovery time is more predictable. Tier 3: Electronic vaulting

Tier 3 solutions build on the components of Tier 2. Additionally, some mission critical data is electronically vaulted. This electronically vaulted data is typically more current than that which is shipped via PTAM. As a result there is less data recreation or loss after a disaster occurs. The facilities for providing Electronic Remote Vaulting consists of high-speed communication circuits, some form of channel extension equipment and either physical or virtual Tape devices and an automated tape library at the remote site. IBM's Peer-to-Peer VTS and Sun's VSM Clustering are two examples of this type implementation.

Tier 4: Point-in-time copies

Tier 4 solutions are used by businesses that require both greater data currency and faster recovery than users of lower tiers. Rather than relying largely on shipping tape, as is common on the lower tiers, Tier 4 solutions begin to incorporate more disk based solutions. Several hours of data loss is still possible, but it is easier to make such point-in-time (PiT) copies with greater frequency than tape backups even when electronically vaulted. Tier 5: Transaction integrity

Tier 5 solutions are used by businesses with a requirement for consistency of data between the production and recovery data centers. There is little to no data loss in such solutions, however, the presence of this functionality is entirely dependent on the application in use. Tier 6: Zero or near-Zero data loss

Tier 6 business continuity solutions maintain the highest levels of data currency. They are used by businesses with little or no tolerance for data loss and who need to restore data to applications rapidly. These solutions have no dependence on the applications or applications staffs to provide data consistency. Tier 6 solutions often require some form of Disk mirroring. There are various synchronous and asynchronous solutions available from the mainframe storage vendors. Each solution is somewhat different, offering different capabilities and providing different Recovery Point and Recovery Time objectives. Often some form of automated tape solution is also required. However, this can vary somewhat depending on the amount and type of data residing on tape.

Tier 7: Highly automated, business integrated solution

Tier 7 solutions include all the major components being used for a Tier 6 solution with the additional integration of automation. This allows a Tier 7 solution to ensure consistency of data above that which is granted by Tier 6 solutions. Additionally, recovery of the applications is automated, allowing for restoration of systems and applications much faster and more reliably than would be possible through manual business continuity procedures.


Wikimedia Foundation. 2010.

Игры ⚽ Нужно сделать НИР?

Look at other dictionaries:

  • Disaster recovery — This article is about business continuity planning. For societal disaster recovery, see emergency management. For other uses, see DRP (disambiguation). Disaster recovery is the process, policies and procedures related to preparing for recovery or …   Wikipedia

  • Computers and Information Systems — ▪ 2009 Introduction Smartphone: The New Computer.       The market for the smartphone in reality a handheld computer for Web browsing, e mail, music, and video that was integrated with a cellular telephone continued to grow in 2008. According to… …   Universalium

  • Data center — An operation engineer overseeing a Network Operations Control Room of a data center. A data center (or data centre or datacentre or datacenter) is a facility used to house computer systems and associated components, such as telecommunications and …   Wikipedia

  • France — /frans, frahns/; Fr. /frddahonns/, n. 1. Anatole /ann nann tawl /, (Jacques Anatole Thibault), 1844 1924, French novelist and essayist: Nobel prize 1921. 2. a republic in W Europe. 58,470,421; 212,736 sq. mi. (550,985 sq. km). Cap.: Paris. 3.… …   Universalium

  • United Kingdom — a kingdom in NW Europe, consisting of Great Britain and Northern Ireland: formerly comprising Great Britain and Ireland 1801 1922. 58,610,182; 94,242 sq. mi. (244,100 sq. km). Cap.: London. Abbr.: U.K. Official name, United Kingdom of Great… …   Universalium

  • India — /in dee euh/, n. 1. Hindi, Bharat. a republic in S Asia: a union comprising 25 states and 7 union territories; formerly a British colony; gained independence Aug. 15, 1947; became a republic within the Commonwealth of Nations Jan. 26, 1950.… …   Universalium

  • Media and Publishing — ▪ 2007 Introduction The Frankfurt Book Fair enjoyed a record number of exhibitors, and the distribution of free newspapers surged. TV broadcasters experimented with ways of engaging their audience via the Internet; mobile TV grew; magazine… …   Universalium

  • arts, East Asian — Introduction       music and visual and performing arts of China, Korea, and Japan. The literatures of these countries are covered in the articles Chinese literature, Korean literature, and Japanese literature.       Some studies of East Asia… …   Universalium

  • Christianity — /kris chee an i tee/, n., pl. Christianities. 1. the Christian religion, including the Catholic, Protestant, and Eastern Orthodox churches. 2. Christian beliefs or practices; Christian quality or character: Christianity mixed with pagan elements; …   Universalium

  • theatre — /thee euh teuhr, theeeu /, n. theater. * * * I Building or space in which performances are given before an audience. It contains an auditorium and stage. In ancient Greece, where Western theatre began (5th century BC), theatres were constructed… …   Universalium

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”