Orlando-Orange County Expressway Authority

Orlando-Orange County Expressway Authority
OOCEA logo.png

The Orlando-Orange County Expressway Authority (OOCEA) is an expressway authority responsible for construction, maintenance and operation of toll roads in Orange County, Florida, United States, which includes the city of Orlando. It was founded in 1963 for the purpose of building the Bee Line Expressway, and soon built the East-West Expressway. It now manages a network of roads including large portions of a beltway around Orlando. The OOCEA operates an electronic toll collection system known as E-PASS, one of the first and most widely-used systems of its kind in the United States. Use of the state's SunPass system is also available on OOCEA roads.

The newest addition to the OOCEA system is an extension of Maitland Boulevard (State Road 414) known as the John Land Apopka Expressway. The expressway opened on May 15, 2009. The project was inherited from the Florida Department of Transportation, which referred to it as the "Apopka Bypass". Planning is also underway for an extension of State Road 429 known as the Wekiva Parkway. In addition, SR 408 is undergoing a massive overhaul, including the relocation of its two main toll plazas, large sections of widening, and expansion of a bridge over Lake Underhill.

The current 25-year plan, the "2030 Master Plan", includes two new toll connections to Brevard County (including an extension of SR 408), a new connection from Sanford to New Smyrna Beach parallel to State Road 415, a southern bypass of SR 417 to Florida's Turnpike south of St. Cloud, and a connection from the Western Beltway to U.S. Highway 27 south of Clermont.

Master Plan 2030

The following roads were built by the OOCEA:

  • Beachline Expressway (SR 528) from State Road 15 to State Road 520, 1966-1967
  • East-West Expressway (SR 408) from State Road 50 west of State Road 435 to State Road 50 east of State Road 551, 1972-1973
  • Beachline Expressway (SR 528) from State Road 482 to State Road 15, 1981-1983
  • Central Florida GreeneWay (SR 417) from State Road 50 to Seminole County, 1987-1988
  • East-West Expressway (SR 408) from State Road 551 to State Road 50 east of State Road 434, 1987-1989
  • Central Florida GreeneWay (SR 417) from State Road 528 to State Road 408, 1989-1990
  • East-West Expressway (SR 408) from Florida's Turnpike to State Road 435, 1989-1990
  • Central Florida GreeneWay (SR 417) from International Drive to State Road 528, 1991-1993
  • Western Beltway (SR 429) from Florida's Turnpike to U.S. Highway 441, 1998-2001
  • Goldenrod Road Extension, 2001-2003
  • Western Beltway (SR 429) from County Road 535 to Florida's Turnpike, 2001-2002
  • Western Beltway (SR 429) from Seidel Road to County Road 535, 2004-2005
  • John Land Apopka Expressway (SR 414) from State Road 429 to U.S. Highway 441, 2008-2009

Many sections of the current expressway system, such as the connection of SR 528 from Sand Lake Road to I-4, the sections of SR 417 in Seminole and Osceola counties, and SR 429 south of Seidel Road, were built by the Florida's Turnpike Enterprise, and their toll facilities are managed by the same.

Beginning in 2007, OOCEA is transitioning from signs that use the FHWA Series E modified typeface to signs that use the new Clearview typeface.

Contents

Canceled projects

The Central Connector, known by the Florida Department of Transportation as State Road 529[1] (SR 529), was a proposed tollway planned to parallel Orange Avenue (SR 527) between downtown Orlando and the Beachline Expressway. The project was canceled in 1991 after much local opposition.

Cost

In 2010, the Authority was attempting to keep the average toll to $0.11 per mile.[2]

References

  1. ^ Orange County Comptroller - Official Records book 5045 page 2928
  2. ^ Schweers, Jeff (6 December 2010). "New Beachline plaza won't increase toll". Melbourne, Florida: Florida Today. pp. 1A. http://m.floridatoday.com/news.jsp?key=364889&rc=ne. 

External links

Browse numbered routes
ex-SR 528A 529 SR 530

Wikimedia Foundation. 2010.

Игры ⚽ Нужен реферат?

Look at other dictionaries:

  • Orlando, Florida — Orlando redirects here. For other uses, see Orlando (disambiguation). Orlando   City   City of Orlando …   Wikipedia

  • Greater Orlando — Orlando – Kissimmee – Sanford Common name: Greater Orlando Metro Orlando Largest city Orlando …   Wikipedia

  • Metroplan Orlando — is the metropolitan planning organization (MPO) for the Orlando, Florida Urban Area, which consists of Orange, Osceola and Seminole Counties. As the regional MPO, METROPLAN ORLANDO provides a forum for multi modal transportation planning and… …   Wikipedia

  • Orlando Executive Airport — USGS aerial photo as of 28 February 1999 IATA: ORL – ICAO: KORL – FAA LID …   Wikipedia

  • Orlando International Airport — Not to be confused with Orlando Sanford International Airport. Orlando Airport and MCO redirect here. For other uses, see Orlando Airport (disambiguation) and MCO (disambiguation). Orlando International Airport …   Wikipedia

  • Seminole County, Florida — Infobox U.S. County county = Seminole County state = Florida founded = April 25 1913 seat = Sanford | area total sq mi =345 area land sq mi =308 | area water sq mi =37 area percentage = 10.63% census yr = 2000 pop = 365196 density km2 =458 web =… …   Wikipedia

  • Florida State Road 528 — State Road 528 Martin Andersen Beachline Expressway Route information …   Wikipedia

  • Florida State Road 417 — State Road 417 Southern Connector Central Florida GreeneWay Seminole Expressway Route information Maintained by OOCEA and Florida s Turnpike Enterprise …   Wikipedia

  • Florida State Road 429 — State Road 429 Western Expressway Route information Maintained by Florida s Turnpike Enterprise and OOCEA …   Wikipedia

  • Florida State Road 414 — State Road 414 Route information Maintained by FDOT …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”