Main Line (Pennsylvania Railroad)

Main Line (Pennsylvania Railroad)
Crossing of the Alleghany, Pennsylvania Railroad, 1853 print

The Main Line of the Pennsylvania Railroad was a rail line in the U.S. state of Pennsylvania, connecting Philadelphia with Pittsburgh via Harrisburg. It is still an important cross-state corridor, composed of Amtrak's Philadelphia to Harrisburg Main Line, SEPTA's Paoli/Thorndale Line and the Norfolk Southern Railway's Pittsburgh Line.

Contents

Early history

The eastern part of the PRR's main line (east of Lancaster) was built by the Commonwealth of Pennsylvania as part of the Main Line of Public Works, a railroad and canal corridor across the state. The system consisted of the Philadelphia and Columbia Railroad from Philadelphia west to Columbia on the Susquehanna River, the Eastern Division Canal from Columbia to Duncan's Island, the Juniata Division Canal from Duncan's Island to Hollidaysburg, the Allegheny Portage Railroad from Hollidaysburg to Johnstown, and the Western Division Canal from Johnstown to the terminus in Pittsburgh.[1] The Philadelphia and Columbia Railroad had one inclined plane at each end; the Allegheny Portage Railroad had ten. The parts that were later included in the PRR main line opened from Philadelphia to Malvern (the end of the West Chester Railroad) in 1832[2] and Malvern to Lancaster in 1834.[3] A short piece of the Allegheny Portage Railroad in East Taylor Township and Conemaugh Township, including the Portage Viaduct over the Little Conemaugh River, later became part of the PRR main line; it was opened in 1834.[3]

The Harrisburg, Portsmouth, Mountjoy and Lancaster Railroad opened from Harrisburg southeast to Middletown and from Lancaster northwest to Rheems in 1836.[4] The next year the piece from Middletown to Elizabethtown opened,[5] and the line was completed in 1838 with the opening of the Elizabethtown Tunnel.[6]

Pennsylvania Railroad Company

On the Way to Pittsburgh -- Great Bend on the Alleghenies, 1871
1855 map of the PRR, including the planned Lancaster, Lebanon and Pine Grove Railroad

The Pennsylvania Railroad Company was chartered by the Pennsylvania legislature on April 13, 1846.[7] Construction began in 1847[8] and the first section opened from Harrisburg west to Lewistown on September 1, 1849 (including the original Rockville Bridge across the Susquehanna River). Further extensions opened to McVeytown on December 24,[9] Mount Union on April 1, 1850, Huntingdon on June 10, and Duncansville (west of Hollidaysburg) on September 16, 1850, taking it to a connection with the Allegheny Portage Railroad on the east side of the Allegheny Ridge.[10] On the other side of the ridge, the main line opened from Conemaugh (on the Portage Railroad east of Johnstown) west to Lockport on August 25, 1851. On December 10, 1851, sections opened from Lockport west to Beatty (west of Latrobe) and from Pittsburgh east to Brinton, with a temporary stagecoach transfer between via the Southern Turnpike and a short turnpike branch built to Beatty.[11] Part of that gap was filled on July 15, 1852, from Brinton east to Radebaugh, and on November 29 the full line was completed, forming the first all-rail route between Philadelphia and Pittsburgh, though still using seven of the original ten planes of the Allegheny Portage Railroad.[12]

Plane Number 1 of the Portage Railroad was bypassed by the PRR on April 1, 1852.[12] Other planes began to be bypassed by the New Portage Railroad, completed in 1856,[13] but on February 15, 1854 the PRR's new line opened, leaving the old one on the east side of the ridge in Altoona and running west via the Horseshoe Curve and Gallitzin Tunnel, only using a short portion of the old Portage Railroad near South Fork and a longer adjacent section of New Portage Railroad. A reciprocal trackage rights agreement made March 18, 1854, allowed the PRR to use that section for free.[14]

On March 21, 1849, the PRR contracted with Eagle Line, primarily a steamboat company, for through service over the Philadelphia and Columbia Railroad. The PRR obtained trackage rights over the Harrisburg, Portsmouth, Mountjoy and Lancaster Railroad, opened in 1838, on April 21, providing a route from Harrisburg to the Philadelphia and Columbia at Dillerville, just west of Lancaster. On September 1, the first section of the PRR opened, with all arrangements in place for service from Philadelphia to Lewistown.[9]

In 1853, the PRR surveyed the Lancaster, Lebanon and Pine Grove Railroad from Philadelphia west via Phoenixville to Salunga on the Portsmouth, Mount Joy and Lancaster Railroad. This was done in order to show the state that the PRR was willing to build its own alignment around the Philadelphia and Columbia.[15] On August 1, 1857, the PRR bought the whole Main Line of Public Works. The Philadelphia and Columbia Railroad was integrated into its system. Most of the New Portage Railroad, just completed the previous year at a cost of $2.14 million, was abandoned, while short sections became local branches.[16] The canals were abandoned, and short sections were filled and covered by rails.[citation needed] On January 1, 1861, the PRR leased the HPMJ&L, giving it full control of its main line.[17]

In 1904, the New Portage Railroad east of the Gallitzin Tunnels (through the "Muleshoe Curve") was reopened as the New Portage Branch, a freight bypass line.[18] Conrail closed this line in 1981.[19]

Panoramic view of Horseshoe Curve on the Pennsylvania Railroad – October 12, 1934.

See also

References

  1. ^ "PA Historical & Museum Commission: Canal Overview". Archived from the original on November 6, 2007. http://web.archive.org/web/20071106072003/http://www.phmc.state.pa.us/ppet/canals/page3.asp?secid=31. Retrieved August 7, 2007. 
  2. ^ PRR Chronology, 1832PDF (77.1 KiB), June 2004 Edition
  3. ^ a b PRR Chronology, 1834PDF (79.7 KiB), June 2004 Edition
  4. ^ PRR Chronology, 1836PDF (93.3 KiB), June 2004 Edition
  5. ^ PRR Chronology, 1837PDF (98.8 KiB), June 2004 Edition
  6. ^ PRR Chronology, 1838PDF (90.6 KiB), June 2004 Edition
  7. ^ PRR Chronology, 1846PDF (38.3 KiB), April 2005 Edition
  8. ^ PRR Chronology, 1847PDF (40.7 KiB), April 2005 Edition
  9. ^ a b PRR Chronology, 1849PDF (43.2 KiB), April 2005 Edition
  10. ^ PRR Chronology, 1850PDF (49.7 KiB), March 2005 Edition
  11. ^ PRR Chronology, 1851PDF (67.7 KiB), March 2005 Edition
  12. ^ a b PRR Chronology, 1852PDF (83.5 KiB), March 2005 Edition
  13. ^ PRR Chronology, 1856PDF (52.4 KiB), March 2005 Edition
  14. ^ PRR Chronology, 1854PDF (79.1 KiB), March 2005 Edition
  15. ^ PRR Chronology, 1853PDF (91.5 KiB), March 2005 Edition
  16. ^ PRR Chronology, 1857PDF (54.1 KiB), March 2005 Edition
  17. ^ PRR Chronology, 1860PDF (91.7 KiB), June 2004 Edition
  18. ^ PRR Chronology, 1904PDF (61.9 KiB), March 2005 Edition
  19. ^ Roberts, Charles S. (1997). Triumph I. Baltimore: Barnard, Roberts. p. 43. ISBN 0-934118-23-X 

Further reading


Wikimedia Foundation. 2010.

Игры ⚽ Поможем написать курсовую

Look at other dictionaries:

  • Main Line (Pennsylvania Railroad) — Die Philadelphia to Harrisburg Main Line als Teil des Keystone Korridors (rot). Die Bahnstrecke Philadelphia–Harrisburg (engl. Philadelphia to Harrisburg Main Line) befindet sich im US Bundesstaat Pennsylvania und verbindet die Großstadt… …   Deutsch Wikipedia

  • Pennsylvania Main Line — The Main Line is a collection of affluent towns in the western suburbs of Philadelphia named after the Main Line of the Pennsylvania Railroad (currently Amtrak s Keystone Corridor and SEPTA s R5 line). History The area comprising the Main Line… …   Wikipedia

  • Main Line of Public Works — Main Line of Public Works …   Wikipedia

  • main line — principal line of a railway, 1841; meaning affluent area of residence is by 1917, originally (with capitals) that of Philadelphia, from the main line of the Pennsylvania Railroad which added local stops to a string of backwater towns west of the… …   Etymology dictionary

  • Pennsylvania Railroad — Infobox SG rail railroad name=Pennsylvania Railroad logo filename=Pennsylvania Herald.png logo size=100 marks=PRR locale=Chicago and St. Louis to New York City and Washington, DC start year=1846 end year=1968 successor line=Penn Central old gauge …   Wikipedia

  • Main Line (Pittsburgh to St. Louis) — The Pittsburgh to St. Louis Main Line was a rail line owned and operated by the Pennsylvania Railroad in the U.S. states of Pennsylvania, Ohio, Indiana, and Illinois. The line ran from Pittsburgh, Pennsylvania west via Steubenville, Ohio,… …   Wikipedia

  • Main Line (Long Island Rail Road) — For other uses, see Main Line (disambiguation).      LIRR Main Line Overview Type …   Wikipedia

  • Main Line (Columbus to Chicago) — The Columbus to Chicago Main Line was a rail line owned and operated by the Pennsylvania Railroad in the U.S. states of Ohio, Indiana, and Illinois. The line ran from Columbus, Ohio northwest via Logansport, Indiana to Chicago, Illinois.[1]… …   Wikipedia

  • Main Line (Columbus to Indianapolis via Bradford) — The Columbus to Indianapolis via Bradford Main Line was a rail line owned and operated by the Pennsylvania Railroad in the U.S. state of Ohio. The line ran from Bradford on the Columbus to Chicago Main Line southwest to New Paris on the… …   Wikipedia

  • Philadelphia Main Line — For other uses, see Main Line (disambiguation). Wayne Station on SEPTA s Paoli/Thorndale line after renovations in 2010 …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”