Thamshavn Line sabotage

Thamshavn Line sabotage

The Thamshavn Line sabotage was a series of sabotages against the railway Thamshavn Line in Orkdal, Norway during World War II. There were four separate sabotages, all performed by Company Linge in an attempt by the Norwegian resistance to prohibit Germany from getting the pyrites that was being extracted at the mine at Løkken Verk.

Background

The Løkken Mine had been operated since 1654, and in 1908 it was modernised with electric pumping and Norway's first electric railway that connected the mine to the port at Thamshavn 25 km away. After the German invasion in 1940 German forces secured control over the mine, but let the operating company Orkla Gruber-Aktieselskab (that since has developed into the Forbes 500-company Orkla Group) continue extraction, since most of the export had been going to Germany anyway. The company obliged, since they saw no advantage in disobeying, which would only have resulted in the German forces themselves taking over the operation of the mine.

The Norwegian government-in-exile decided that it was important to stop the Germans from obtaining copper and sulfur form the mines and the smelters at Thamshavn (now Elkem Thamshavn) and initially suggested bombing both Løkken Verk and Thamshavn. But the resistance protested, and felt that by using sabotage the civilian losses could be minimised. And so it was decided to attempt to stop the mining through targeted sabotage on key infrastructure along the railway.

Transformer station

The first target was the transformer station for the railway at Bårdshaug. Since the railway operated solely on electric locomotives, removing the power source would make it impossible to operate it. Three soldiers from Company Linge were chosen for the action: Torleif Grong, Per Getz, and their leader Leutenent Peter Deinboll. They traveled with a fishing boat from England and were put to shore at Bjørnør on Fosen and traveled by foot to Namdalseid. They were constantly passed by German trucks, and figured there would be less chance to be captured if they hitch hiked with one of them. When a truck offered them a lift they accepted, and the officer onboard offered to sit in the back and watch their backpacks—which were filled with explosives. Luckily for the saboteurs the backpacks were not seized.

The night before 4 May 1942 the three men arrived at Orkdal where they went and targeted the transformer station. While they were installing the explosives German soldiers passed by, but failed their duty by not checking inside the station and thus were not able to abort the sabotage. The explosion went off at five in the morning. The commander in the area, Hauptmann Møbius, had been out drinking the evening before, and was not able to organise an efficient search or investigation. Unfortunately for Deinboll he had miscalculated the time before the explosion and was spotted by German troops and a chase was organised, but the troops failed to find him. He caught a ride with a fishing boat to Trondheim were he rendezvoused with Grong and Getz and they drove to Sweden via Meråker. [cite book |last=Thamshavnbanens Venner |title=Thamshavnbanen |year=1983 |publisher=Kaare Grytten |location=Orkanger |pages=46]

Thamshavn

The second target for sabotage was the port at Thamshavn and was performed by Deinboll, Bjørn Pedersen and Olav Sættem. At first they lived at Deinboll's parents' home at Thamshavn, but later they moved to a cabin in the forest, receiving supplies from local resistance members. They figured, due to heavy security, that it would be impossible to blow up the factory itself, so instead they chose to blow up the ship "D/S Nordfahrt", that would be full of pyrites. The night before 25 February 1943 the three went out in a row boat to fasten explosives to the ship, timed to go off at 16:00 the next day. But the next day another ship arrived at the port and "Nordfahrt" was moved out into the fjord. Because of this the timing mechanism became inaccurate and just when the ship blow a tugboat came by and managed to haul the wreck to land. The three each travelled to Trondheim, with plans to go to Sweden via Steinkjer and Ogndal, but their contact in Steinkjer had been arrested and instead they had to travel via Selbu. [cite book |last=Thamshavnbanens Venner |title=Thamshavnbanen |year=1983 |publisher=Kaare Grytten |location=Orkanger |pages=48]

Locomotives

Neither of the two first sabotages had resulted in especially large problems that could not be fixed, and the resistance decided that the third target was to be the rack lift in the mine. Secondarily, if it failed, the saboteurs were to take out all of the locomotives able to pull railway cars, thus prohibiting the transport of pyrites. This required seven men, again led by Deinboll. They were dropped by parachute at Svorkdalskjølen and hid in cabins in the forest. But they were soon discovered, and chose to move to Skjenalddalen.

On 31 October 1943 the group planned to blow up one British Westinghouse locomotive and one rail car at Løkken and one ASEA at Orkanger and one rail car and two Westinghouse locomotives at Thamshavn. But not all the locomotives were located where the saboteurs thought they were and only four were blown up. This was not good enough for Deinboll, and it was decided that a new sabotage was to be performed at Klinghåmmår'n where they were to stop the train, chase the staff and blow up the train and track. But things went wrong, the explosives were miscalculated and Odd Nilsen was killed. At the same time an attempt to blow up a rail car at Løkken failed, again due to miscalculation in the explosive timing. After this the saboteurs left the area, but Paal Skjærpe was arrested in Hovin and tortured by Gestapo in Trondheim. But he did not talk, and was scheduled for execution on |7 May 1945, only days after peace came to Norway. [cite book |last=Thamshavnbanens Venner |title=Thamshavnbanen |year=1983 |publisher=Kaare Grytten |location=Orkanger |pages=50]

Last attempt

The final attempt to close down the export came in 1944 when three men returned, via Sweden, to blow up the remaining locomotives. On 9 May they stopped a train at Hongslomælen, the crew was chased away and the train blown up. This was repeated on 31 May when they blew up the last rail car. But the Germans took countermeasures, and brought up steam locomotives from Germany to operate the line.

One of the great logistical problems of the Germans was that Thamshavnbanen operated on a metre gauge (1000 mm) railway, unlike the rest of the Norwegian network, that operated on standard gauge (1435 mm) or conventional narrow gauge (1067 mm). So acquisition of engines had to be done from the continent. And the railway was the only in the world to use 25 Hz 6.6 kV AC power supply in combination with metre gauge, and so the Germans had to acquire steam locomotives. A total of seven were brought up from Germany and France. Also, the Germans chose to rebuild the railway with dual gauge, so the line had three parallel tracks, on in metre gauge and one in standard gauge. This would allow the Germans to operate steam engines from the Dovre Line on the standard gauge track and the railway cars on the narrow gauge tracks. No standard gauge locomotives were acquired and the third track removed after the war.

References


Wikimedia Foundation. 2010.

Игры ⚽ Поможем решить контрольную работу

Look at other dictionaries:

  • Thamshavn Line — Infobox rail line name = Thamshavn Line caption = Passenger train at Bårdshaug Station in 1912 type = Railway system = status = Heritage start = Løkken Verk end = Thamshavn stations = 6 open = 1908 close = 1974 owner = Salvesen Thams operator =… …   Wikipedia

  • Rjukan Line — Infobox rail line name = Rjukan Line nativename = Rjukanbanen caption = SF Ammonia , at Mæl, where the railway cars were ferried across Tinnsjø type = Railway system = status = Heritage start = Rjukan Station end = Mæl Station stations = 5 open …   Wikipedia

  • Tinnos Line — Infobox rail line name = Tinnos Line nativename = Tinnosbanen caption = The railway ferry MF Storegut at Tinnoset type = Railway system = status = Heritage start = Notodden end = Tinnoset stations = 7 open = 9 August 1909 close = 1 January 1991… …   Wikipedia

  • Nordland Line — An NSB Di 4 unit on the Nordland Line at Saltfjellet Overview Type Railway …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”