Cromford Canal

Cromford Canal
Cromford Canal
{{{alt}}}
The end of the canal, in Cromford
Original owner Cromford Canal Company
Principal engineer Benjamin Outram
Date of act 1789
Date completed 1794
Start point Cromford
End point Langley Mill
Branch(es) Pinxton
Connects to Erewash Canal, Nottingham Canal
Locks 14
Status Part navigable, part derelict
Navigation authority Derbyshire County Council
Sketch of the canal
[v · d · e]Cromford Canal map
Legend
Unknown BSicon "uWHARF"
Cromford Wharf
Waterway with marina/wharf on right
High Peak Junction
Unknown BSicon "uFEEDERr" Pumping station
Leawood Pumping Stn
Unknown BSicon "ueKRZo" Unknown BSicon "uxFEEDERu"
Leawood Aqueduct River Derwent
Unknown BSicon "uxgJUNCld" Unknown BSicon "ugSTRq"
Nightingale Arm
Unknown BSicon "umKRZo"
Aqueduct Derby-Matlock Rly
Unknown BSicon "ueKRZo"
High Peak Aqueduct
Unknown BSicon "uTUNNEL1"
Gregory Tunnel (76 yd)
Unknown BSicon "ugTRANSg"
End of navigable section
Unknown BSicon "ugSTRfr"
Ambergate
Unknown BSicon "ugTUNNEL1"
Hag Tunnel
Unknown BSicon "xgKRZo"
River Amber Aqueduct
Unknown BSicon "ugAKRZo"
A610 Ripley - Ambergate Road
Unknown BSicon "ugTUNNEL1"
Buckland Hollow Tunnel (33 yd)
Unknown BSicon "ugmKRZu"
Chesterfield - Derby Rly
Unknown BSicon "ugTUNNELa"
Butterley Tunnel (3063 yd)
Unknown BSicon "ugtFEEDERr" Unknown BSicon "uRESRr"
Butterley Resr and feeder
Unknown BSicon "ugtSTR" Unknown BSicon "uexWHARF"
Pinxton Wharf
Unknown BSicon "ugTUNNELe" Unknown BSicon "uxgTRANSg"
Unknown BSicon "uxgTRANSf" Unknown BSicon "ugmKRZu"
LNER bridge Chesterfield - Nottingham Rly
Unknown BSicon "uxFEEDERr" Unknown BSicon "uRESRr" Unwatered canal
Codnor Park Resr and feeder
Unknown BSicon "uxgTRANSg" Unknown BSicon "ugmKRZu"
Midland Railway Centre
Unknown BSicon "ugJUNCld" Unknown BSicon "ugSTRq" Unknown BSicon "ugSTRrf"
Unknown BSicon "ugLOCKSu"
1-7 Codnor Park Locks (7)
Unknown BSicon "ugJUNCld" Unknown BSicon "ugddHSTRf"
Portland Basin
Unknown BSicon "ugmKRZu"
LNER bridge Chesterfield - Nottingham Rly
Unknown BSicon "ugFGATEu"
8 Butterley Co Lock
Unknown BSicon "ugFGATEu"
9 Stoneyford Lock
Unknown BSicon "ugFGATEu"
10 Stoneyford Deep Lock
Unknown BSicon "ugFGATEu"
11 Stoneyford Shallow Lock
Unknown BSicon "xgKRZo"
Erewash Aqueduct
Unknown BSicon "ugFGATEu"
12 Vickers Lock
Unknown BSicon "ugFGATEu"
13 Strutts Lock
Unknown BSicon "ugAKRZu"
A610 road bridge
Unknown BSicon "ugTRANSf"
Unknown BSicon "uFEEDERr" Unknown BSicon "uRESRr"
Moorgreen Resr and feeder
Unknown BSicon "uJUNCld" Unknown BSicon "uddHSTRg" Urban track turning from right
Urban straight track Unwatered canal turning left
Nottingham Canal
Unknown BSicon "uFGATEu"
14 Langley Bridge Lock
Unknown BSicon "uAKRZu"
A608 Derby Road bridge
Unknown BSicon "uTRANSf"
Erewash Canal

The Cromford Canal ran 14.5 miles (23 km) from Cromford to the Erewash Canal in Derbyshire, England with a branch to Pinxton. Built by William Jessop with the assistance of Benjamin Outram, its alignment included four tunnels and 14 locks.[1]

From Cromford it ran south following the 300-foot (91 m) contour line along the east side of the valley of the Derwent to Ambergate, where it turned eastwards along the Amber valley. It turned sharply to cross the valley, crossing the river and the Ambergate to Nottingham road, by means of an aqueduct at Bullbridge, before turning towards Ripley. From there the Butterley Tunnel took it through to the Erewash Valley.

From the tunnel it continued to Pye Hill, near Ironville, the junction for the branch to Pinxton, and then descended through fourteen locks to meet the Erewash Canal at Langley Mill. The Pinxton Branch became important as a route for Nottinghamshire coal, via the Erewash, to the River Trent and Leicester and was a terminus of the Mansfield and Pinxton Railway.

A 6-mile (9.7 km) long section of the Cromford canal between Cromford and Ambergate is listed as a Biological Site of Special Scientific Interest (SSSI).[2]

In addition to purely canal traffic, there was a lively freight interchange with the Cromford and High Peak Railway, which traversed the plateau of the Peak District from Whaley Bridge in the north west, and which descended to the canal at High Peak Junction by means of an inclined plane.

Contents

Origins

At the end of the eighteenth century an extension was proposed to the Erewash Canal by various interested parties who wished to encourage coal mining further north. The suggestion was declined by the canal company, so local businessmen, including Joseph Outram, the father of Benjamin decided to go ahead on their own, asking William Jessop to design one between Langley Mill and Cromford, with a branch to Pinxton. This would carry coal to Cromford, which was becoming industrialised, and limestone from the area for the growing iron industry. Also important would be lead from Wirksworth and cotton from the Cromford mills. The connection to the Erewash Canal would provide an outlet to the Trent and Mersey Canal and the rest of the country.

The canal therefore attracted the support of some powerful figures such as Philip Gell of Hopton Hall and Sir Richard Arkwright - the latter initially at least. Matters were taken out of the Erewash Canal owners hands, for, without their co-operation, there was the implicit threat that a competing canal would be built to the Trent. The major opposition came from the water-powered mill owners along the Derwent, of which there were many, downstream of the proposed canal, fearful of loss of flow in dry weather. Since, between Cromford and Pinxton, the canal would be level, Jessop was able to give reassurance, carefully downplaying the problem of the descent, with its locks, to Langley Mill.

However, with the assistance of Benjamin Outram, he also spent over a year measuring the flow rate of the Derwent, a precaution which was invaluable when the bill was placed before Parliament. He also proposed to make the summit pound deep enough that it could be replenished on Sundays when the mills were closed, and hold enough water to supply the locks for a week even in the driest weather.

The length from the Erewash Canal would be built to match, accessible to barges from the Trent. Through the Butterley Tunnel and along the narrow Derwent valley it would be to narrow boat standards, similar to the Trent and Mersey.

At the last minute before the Bill was to be presented to Parliament, Richard Arkwright raised a problem. The assumption had been that water would come from Cromford Sough, the drainage from the Wirksworth lead mines. Arkwright complained that the canal crossed his land and insisted that water should be obtained from the river by raising the height of the weir at Masson Mill. This was an unwelcome complication (which would mainly benefit Arkwright himself and his mill) but the canal Committee reluctantly agreed.

Construction

The canal obtained its Act of Parliament in 1789. Perhaps because they had quoted too little, basing their estimates on Jessop's cost predictions which may themselves have been too optimistic, the contractors soon found themselves in financial difficulties and, at the end of 1790, simply walked off the site. Benjamin Outram hastily took over full management control and was awarded a salary increase. In January 1792 there was a problem when the Amber Aqueduct failed but, by May, the canal to the east of Butterley was virtually complete and most of the earthworks to the west.

The Pinxton arm viewed from where it joins the main canal

The Butterley Tunnel was excavated by first sinking 33 shafts, about 75 yards (69 m) apart as much as 57 yards (52 m) deep to give a number of working faces. Most of the heading was through soil, with some coal measures and iron ore deposits, the final tunnel being lined through most of its length.

By 1793 the company had a balance in hand of only £273 and the cost had risen to half as much again as Jessop's original estimate. Nevertheless the canal was showing an income, unfinished though it was.

In August, however, there were problems with the Derwent Aqueduct which required considerable modification. The spandrel walls had parted due to the horizontal forces imposed by the canal, and a longitudinal split had opened up in the arch. In his report to the canal committee, Jessop gave his opinion that the use of Crich lime, being unusually pure, had delayed the setting of the mortar. Later writers, with the benefit of engineering knowledge acquired after Jessop's time, have suggested that the spandrel walls were simply too slender for the forces imposed. At any rate, the arch was partly dismantled and steel tie bars and lateral reinforcing arches were installed, together with external buttresses. This Jessop did at his own expense.

In the end, despite costing about twice the initial estimate (£42,697) (£3,910,000 as of 2011),[3], the canal opened in 1794 and was a financial success.

Gregory Tunnel entrance near Lea Wood
Inside Gregory Tunnel

Operation

Jessop had based his initial predictions for the expected returns on the carriage of limestone from Cromford and Crich and coal from Pinxton. However the canal itself encouraged new enterprises. The canal mostly carried coal, lead and iron ore, some extracted from inside the Butterley Tunnel. Copper was brought from as far away as Ecton Hill in Staffordshire and the canal opening the way for lead from Ecton, as well as Wirksworth to be taken to the Lead Market at Hull and chert from Bakewell to the Potteries. It also allowed the finished products of the area to be exported widely, the Butterley Company's castings and Arkwright's spun cotton. The opening of the Derby Canal and the Nottingham Canal, both in 1796 , further facilitated the latter's trade with these textile centres.

Although Arkwright had suggested that water should be drawn from the Derwent (by raising his weir at Masson Mill and feeding it via an aqueduct to Cromford Meadows - thus improving his plans for quarries behind Willersley and adding extra power to his mill wheels at the expense of the Canal Company), the canal committee had secretly no intention of so doing. The Proprietors changed the line of the canal to its present terminus, where a connection was made to the Cromford sough, even though they had to purchase the land from Arkwright at £1000 and landscape (at unknown cost) the grounds of his then house. Water could be drawn from the sough at night as well as at weekends. Coming from underground, it was slightly warm, and it was said that it never froze. (Arkwright had been using the sough water to power Cromford Mill since the last century.) The opening of the Nottingham Canal provided further water via the Butterley Reservoir, almost above Butterley Tunnel and on the summit level of the Cromford Canal.

The sign displayed at both ends of Butterley tunnel

The sign illustrated (left) was displayed at both ends of the Butterley tunnel, and stressed the importance of only using the narrow tunnel in any one direction at particular times. There are reported instances of fines levied for non-compliance with these rules.[4]

In 1819 the Mansfield and Pinxton Railway opened up trade with Mansfield including moulding sand for the foundries.

In 1831, the Cromford and High Peak Railway opened a route up to Manchester

Wharf buildings at High Peak Junction

The canal also carried limestone from the Butterley Company's quarry at Crich with a plateway to the Amber Wharf at Bullbridge. In an attempt to avoid using cable-haulage or a rack and pinion system, a remarkable steam engine, the "Steam Horse" was tried out in 1813.

In 1840 when the North Midland Railway was built, George Stephenson was faced with the problem at Bullbridge of taking the line over the road but under the canal, thus the Bullbridge Aqueduct, in its final form, placed the river, road, railway and canal at four levels.

A section of the canal in shallow water just before the Codnor Park Reservoir

In 1846 the mining beneath Wirksworth had reached such a depth that Meerbrook Sough was built, draining into the Derwent near Whatstandwell, which deprived both Arkwrights mill and the canal of water, leaving the latter with only that from Butterley Reservoir. Accordingly the canal owners first hired a pump and then built the Leawood Pump Housein 1849 buying a Cornish type beam engine from Grahams of Elscar.

Leawood pump house

Decline

In 1802 the canal had carried over 150,000 tons and by 1842 nearly 300,000, then in 1849, the Manchester, Buxton, Matlock and Midlands Junction Railway was built alongside as far as Ambergate, which reached Manchester in 1867. A further line to Pye Bridge was built in 1875. By 1888 trade had shrunk to 45,000 tons a year.

In 1846, Parliamentary assent was granted to merge with the MBM&MJR. The sale was not carried through until 1852 by which time the Midland Railway and the LNWR had assumed joint control and, with railway lines from Rowsley through Ambergate to the north and south, it was being used for little more than local traffic.

In 1889, subsidence closed the 3,063 yard (2801m) Butterley Tunnel for four years, and further subsidence in 1900 closed the Tunnel permanently. Most of the canal was abandoned in 1944 with the exception of a half-mile (800m) stretch to Langley Mill which was abandoned in 1962. The Bullbridge Aqueduct was removed in 1968 when the Ripley road was widened. In 1985 the Codnor Park Reservoir was lowered by 6 feet (1.8 m) and a lock was removed as part of a flood prevention scheme.

Restoration

After closure, the canal was taken over by the British Waterways Board and acquired by Derbyshire County Council in 1974. Between 1968-9 and 1989 the 5 miles between Cromford and Ambergate were restored either partly or wholly by the Cromford Canal Society [CCS] together with the beam engine (the Leawood Pump) which was restored to full operation, pumping water from the River Derwent to the Canal above. CCS ran horse-drawn passenger boats (up to 15,000 passengers a year) on the 1½ mile section from Cromford to Leawood and steamed the beam engine on regular occasions. The lower section from Leawood to Leashaw (through Gregory Tunnel) was restored to navigation but storm damage to embankments prevented its use. CCS ceased to exist in 1990 and this part of the canal has nearly reverted to pre-restoration condition. Attempts are being made to restore the canal and about 5 miles (8 km) of it remains in water.

The towpath from Ambergate to Cromford is now a very popular walking route, with the Derwent Valley Line adjacent, Leawood Pump House and the High Peak Junction of the Cromford and High Peak Railway.

Friends of the Cromford Canal

The Friends of the Cromford Canal is a charitable organisation whose aim is to see the restoration of the Cromford Canal for the benefit of the general public. The society promotes the restoration of the Canal to navigation, and to connect it to the national inland waterway system at the junction with the Erewash Canal at Langley Mill.

See also

Moore Bridge.jpg UK Waterways portal

Notes

References

  • Schofield, R.B. (2000) Benjamin Outram 1764–1805 : an engineering biography, Cardiff: Merton Priory, ISBN 1-898937-42-7
  • Cooper, B. (1991) Transformation of a Valley: The Derbyshire Derwent, Cromford: Scarthin (originally by London : Heinemann, 1983), ISBN 0-907758-17-7

Further reading

  • De Salis, Henry Rodolph (1969). Bradshaw's Canals and Navigable Rivers. David & Charles. ISBN 0-7153-4689-X. 
  • Hadfield, Charles (1970). The Canals of the East Midlands (2nd Ed. ed.). David & Charles. ISBN 0-7153-4871-X. 
  • Harrison, Michael and Roberts, Valerie (2003). A Walker's Guide to the Cromford Canal. The Friends of Cromford Canal. ISBN 0-9544482-0-0. 
  • Henshaw, Alfred (2000). The Great Northern Railway in the East Midlands. RCTS. ISBN 0-901115-88-6. 
  • Potter, Hugh (2003). The Cromford Canal. NPI Media Group. ISBN 0-7524-2802-0. 
  • Rimmer, A. (1998) [1956]. Cromford and High Peak Railway (New ed. ed.). Oakwood Press. ISBN 0-85361-319-2. 
  • Russell, Ronald (1971). Lost Canals of England and Wales (First ed.). David & Charles. ISBN 0-7153-5417-5. 
  • Stoker, Simon (2009). There and Back Again, Restoring the Cromford Canal 1968–1988. Amberley Books. ISBN 978-1-84868-153-8. 

External links

Coordinates: 53°03′50″N 1°28′57″W / 53.063952°N 1.482618°W / 53.063952; -1.482618


Wikimedia Foundation. 2010.

Игры ⚽ Поможем сделать НИР

Look at other dictionaries:

  • Cromford and High Peak Railway — The Cromford and High Peak Railway (C HPR) in Derbyshire, England, was completed in 1831, to carry minerals and goods between the Cromford Canal wharf at High Peak Junction (53°06′01″N 1°32′01″W /  …   Wikipedia

  • Cromford Wharf — For Cromford Goods Wharf (at High Peak Junction), or Wharf Shed, see High Peak Junction. A former transit shed at Cromford Wharf …   Wikipedia

  • Cromford Mill — Coordinates: 53°06′32″N 1°33′22″W / 53.1090°N 1.5560°E / 53.1090; 1.5560 …   Wikipedia

  • Cromford — Coordinates: 53°06′29″N 1°33′40″W / 53.108°N 1.561°W / 53.108; 1.561 …   Wikipedia

  • Cromford and High Peak Railway — Die Cromford and High Peak Railway (C HPR) in Derbyshire, England, wurde 1831 fertiggestellt, um Kohle und Waren zwischen der High Peak Junction am Cromford Canal und der Whaley Bridge am Peak Forest Canal zu transportieren. Gleisbau Werkstätten… …   Deutsch Wikipedia

  • Nottingham Canal — [v · d · …   Wikipedia

  • Erewash Canal — The Erewash Canal is a broad canal in Derbyshire, England. It runs just under 12 miles (19 km) and has 14 locks. The first lock at Langley Bridge is actually part of the Cromford Canal. Origins The canal obtained its act of parliament in 1777… …   Wikipedia

  • Peak Forest Canal — Infobox Canal name = Peak Forest Canal caption = Horseboat Maria Descending Lock 9 on the Peak Forest Canal company = Peak Forest Canal Company engineer = Benjamin Outram a engineer = Thomas Brown date act = 1794 date const = 1794 date use =… …   Wikipedia

  • Trent and Mersey Canal — Infobox Canal name = Trent and Mersey Canal caption = The Trent and Mersey Canal near Branston Water Park o name = company = engineer = a engineer = James Brindley date act = 1766 date const = date use = 1777 date comp = date ext = date closed =… …   Wikipedia

  • Grand Junction Canal — The Grand Junction Canal is a canal in England from Braunston in Northamptonshire to the River Thames at Brentford, with a number of branches. The mainline was built between 1793 and 1805, to improve the route from the Midlands to London, by… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”