Technical change

Technical change

A technical change is a term used in economics to describe a change in the amount of output produced from the same inputs. A technical change is not necessarily technological as it might be organizational, or due to a change in a constraint such as regulation, input prices, or quantities of inputs.

It is possible to measure technical change as the change in output per unit of factor input.


Wikimedia Foundation. 2010.

Игры ⚽ Нужно решить контрольную?

Look at other dictionaries:

  • Hicks-neutral technical change — A Hicks neutral technical change is a change in the production function of a business or industry which satifies certain economic neutrality conditions. The concept of Hicks neutrality was first put forth in 1932 by John Hicks in his book The… …   Wikipedia

  • Change control — within Quality management systems (QMS) and Information Technology (IT) systems is a formal process used to ensure that changes to a product or system are introduced in a controlled and coordinated manner. It reduces the possibility that… …   Wikipedia

  • Technical Ecstasy — Студийный альбом Black Sabbath Дата выпуска 25 сентября 1976 Записан …   Википедия

  • Technical diving — Technical diver during a decompression stop. Technical diving (sometimes referred to as Tec diving) is a form of scuba diving that exceeds the scope of recreational diving (although the vast majority of technical divers dive for recreation and… …   Wikipedia

  • Technical debt — (also known as design debt or code debt) are synonymous, neologistic metaphors referring to the eventual consequences of poor software architecture and software development within a codebase. Common causes of technical debt include (a combination …   Wikipedia

  • Change Giver — Studio album by Shed Seven Released September 5, 1994 …   Wikipedia

  • Technical ecstasy — Album par Black Sabbath Sortie 1977 Durée 40 min 36 Genre(s) Heavy metal Albums de Black Sabbath …   Wikipédia en Français

  • Technical Ecstasy — Álbum de Black Sabbath Publicación 25 de septiembre de 1976 Grabación 1976, Criteria Studios Género(s) Heavy metal …   Wikipedia Español

  • Technical Ecstasy — Album par Black Sabbath Sortie 1977 Durée 40 min 36 Genre Heavy metal Albums de Black Sabbath …   Wikipédia en Français

  • Change management (engineering) — The change management process in systems engineering is the process of requesting, determining attainability, planning, implementing, and evaluating of changes to a system. It has two main goals: supporting the processing of changes – which is… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”