North Shore Connector

North Shore Connector
Gateway Center Station construction in August 2011.

The North Shore Connector project is a 1.2 mile (1.9 km) tunnel under construction in Pittsburgh, Pennsylvania. It is an extension of Pittsburgh's 25-mile subway/light rail system from its current terminus at Gateway Center Station in Downtown to the new North Side Station and Allegheny Station on the North Shore by way of a tunnel under the Allegheny River. Planned since the late 1990's, it received federal funding on February 6, 2004 and had crews complete the initial bore under the river on July 10, 2008. The new Allegheny Station will be on the site of the Carnegie Science Center's former UPMC SportsWorks building. The site will also contain the turnaround point and trolley car depot.[1]

The project is scheduled to be opened on March 25, 2012.[1][2]

Contents

Areas and attractions served

The North Shore neighborhood of Pittsburgh evolved from a "sea of asphalt" in the 1990s to a bustling extension of the central business district reflecting approximately $1 billion in investment and construction in the first decade of the 2000s.[2][3] The North Shore Connector links Pittsburgh's existing 25-mile light rail network to the new businesses and attractions of the North Shore.

The North Side Station will serve PNC Park (1.75 million annual fans) and the Community College of Allegheny County (7,200 students). The Allegheny Station will serve Heinz Field (500,000 annual fans, excluding concerts), the Carnegie Science Center (700,000 annual visitors), and the Rivers Casino.[4][5]

Other businesses and attractions served include the Del Monte corporate headquarters (600 employees), Equitable Resources (450 employees), the SpringHill Suites Marriott Hotel and other nearby hotels, Stage AE North Shore Amphitheater (Indoor rock club plus outdoor amphitheater with lawn for 5,500 visitors opening December 2010), the Andy Warhol Museum (90,000 visitors), and many other night spots and restaurants.[5]

Reception

The North Shore Connector project has attracted considerable controversy on both the local and national level. The points of contention include whether the North Shore Connector is the best way to extend Pittsburgh's light rail network; whether the North Shore Connector will prove to be competitive with existing roads, bridges, and trails in attracting commuters; and whether the project's long-term benefits to the region will justify its cost. Its supporters have argued that any enhancement of public transportation infrastructure in the region should be welcome if it decreases regional reliance on automobiles, especially given the uncertainty of future fuel prices and the paucity of parking in the central business district, while opponents have argued that the project's small scope and large budget constitute a waste of government spending.

Locally, it has been argued that the Pittsburgh Light Rail network probably deserves to be expanded, but that the most logical extension would be an eastward one, not a northward one.[3][6] The "Spine Line", a proposed eastward extension reaching from the Central Business District to Oakland, was abandoned in part due to its prohibitive projected cost of over $1 billion and its estimated 15-year planning and construction schedule.[3] The North Shore Connector, by comparison, could be built quickly and with a substantially smaller budget. As one local columnist wrote, "People argue the T line should have gone to Oakland first, and they're right…The North Shore Connector is our consolation prize."[6]

On the national level, the project has attracted controversy due to its cost and its use of federal funding. The project's original budget was estimated at $350 million,[7] but it increased to $435 million by 2006,[8] and to more than $550 million by 2009,[7] later revised down to $528.8 million in 2010.[2] Eighty percent of the funding was provided by the U.S. federal government.[8] The North Shore Connector was ranked #3 in the nation among stimulus-funded projects purported to waste taxpayer money in a report by Senators John McCain and Tom Coburn. The "Summertime Blues" report, their third in a series, identified 100 projects throughout the country that received money from the $787 billion American Recovery and Reinvestment Act, signed into law in 2009 by President Barack Obama, which the senators classified as wasteful government spending. According to McCain, the Connector is an example of stimulus dollars spent to fund projects with "questionable goals," or those that "are being mismanaged or were poorly planned." Meanwhile Coburn reminded the media that the initial budget was approximately $390 million, but "quickly ballooned" to a cost of $553 million.[9][10] In 2009 then-Governor Ed Rendell, a Democrat, called the tunnel "a tragic mistake" and expressed his wish that the project had never been started. He further stated his belief that the money given to the state from the American Recovery and Reinvestment Act should have been applied to the transportation needs of the state "in a more beneficial fashion".[11] Supporters of the North Shore Connector have argued that the stimulus funds have provided stability to the local construction industry while enhancing the public transportation infrastructure of the city, and one columnist noted that "[i]f the federal government didn't build [the North Shore Connector] here, it would have built something equally expensive somewhere else."[6]

In 2010, the Pittsburgh Tribune-Review expressed its opposition to the project, noting that there were already four bridges capable of transporting people from the Downtown area to the city's North Shore and North Side. The Tribune-Review further stated that PNC Park is already accessible to Pittsburgh Pirates fans via the Roberto Clemente Bridge, while the Pittsburgh Steelers have sold out Heinz Field for years without the project's help.[12] These critiques do not take into account the fact that any northward expansion of Pittsburgh's light rail network would require that the Allegheny river be crossed in some fashion, and the light rail cars could not utilize existing bridges. The engineers who planned the project concluded that a tunnel, rather than a new or retrofitted bridge, would be the most cost-effective solution to this issue.[6] In addition, in December 2010, the Steelers began examining the possibility of increasing the capacity of Heinz Field by "several thousand" seats. The president of Alco Parking, Merrill Stabile, noted that the North Shore lacks the parking capacity to serve additional fans, and that the North Shore Connector could help alleviate the congestion by "making it easier for fans to park Downtown".[13] Supporters have argued that the North Shore Connector will not only ease weekend congestion on the North Shore, but will also ease weekday congestion in the Central Business district. On weekdays, commuters will be able to ride the light rail from the North Shore to the central business district by parking in one of the underutilized parking lots or garages of the North Shore.[13] Buses serving the region north of Pittsburgh could make terminal stops at the North Shore light rail stations rather than driving into the central business district, further decreasing congestion on the city streets—"a gift to all rush-hour commuters".[6]

One positive aspect of the project highlighted by its supporters is that it makes any future northward expansions of the light rail network significantly easier because the problem of crossing the Allegheny River has already been solved. More generally, the project reflects a regional commitment not to neglect public transportation infrastructure in favor of a purely automobile-based transportation system, with one columnist noting that "[a] light-rail line that stretches from the South Hills to the North Side is going to look much better when gas shoots back over $4 a gallon…Regions that offer residents varied transportation options will be the ones that succeed in this century."[6]

See also

References

  1. ^ "Getting Around: Transportation wish list would cost billions - Pittsburgh Post-Gazette, November 11, 2007.
  2. ^ a b c Schmitz, Jon (26 November 2010). "North Shore Connector said to be on schedule and under budget". Pittsburgh Post-Gazette. http://www.post-gazette.com/pg/10330/1106180-147.stm. Retrieved 22 January 2011. 
  3. ^ a b c O'Neill, Brian (8 June 2008). "North Shore Connector, you're looking good". Pittsburgh Post-Gazette. http://www.post-gazette.com/pg/08160/888095-155.stm. Retrieved 22 January 2011. 
  4. ^ http://www.portauthority.org/paac/portals/capital/NorthShore/NSCProjectMap.pdf
  5. ^ a b Port Authority, North Shore Connector
  6. ^ a b c d e f O'Neill, Brian (5 August 2010). "Subway tunnel is hardly a money pit". Pittsburgh Post-Gazette. http://www.post-gazette.com/pg/10217/1077747-155.stm. Retrieved 22 January 2011. 
  7. ^ a b How did Port Authority get into this deep, expensive hole of river tunnel?, Pittsburgh Post-Gazette, March 15, 2009
  8. ^ a b "U.S. gives green light to tunnel under river" - Pittsburgh Post-Gazette, September 9, 2006.
  9. ^ "North Shore Connector No. 3 on wasteful spending list - Pittsburgh Tribune-Review, August 4, 2010
  10. ^ "Coburn, McCain release report that shows stimulus funds aren’t working - The Tulsa Beacon, August 12, 2010
  11. ^ Rendell: T work 'tragic mistake' - Pittsburgh Tribune-Review, February 19, 2009
  12. ^ "That Hole in the Water - Pittsburgh Tribune-Review, August 8, 2010
  13. ^ a b Lord, Rich (28 December 2010). "Steelers look to add seats to Heinz Field". Pittsburgh Post-Gazette. http://www.post-gazette.com/pg/10362/1113878-53.stm. Retrieved 22 January 2011. 

External links


Wikimedia Foundation. 2010.

Игры ⚽ Нужно решить контрольную?

Look at other dictionaries:

  • Light rail in North America — The term light rail was coined in 1972 by the U.S. Urban Mass Transit Association (UMTA) to describe new streetcar transformations which were taking place in Europe and the United States. The Germans used the term stadtbahn to describe the… …   Wikipedia

  • North Greenbush, New York — Coordinates: 42°40′30″N 73°39′29″W / 42.675°N 73.65806°W / 42.675; 73.65806 …   Wikipedia

  • North Richmond, California — For the suburb of Sydney, Australia, see North Richmond, New South Wales. North Richmond   Census designated place   …   Wikipedia

  • Flushing and North Side Railroad — 1873 Map of the Flushing and North Side Railroad. The Flushing and North Side Railroad is a former railroad on Long Island built by Conrad Poppenhusen as a replacement for the former New York and Flushing Railroad. The railroad was established in …   Wikipedia

  • Lake Erie Connector Bicycle Route — The Adventure Cycling Association Lake Erie Connector Bicycle Route Connects the North Lakes Bicycle Route and the Northern Tier Bicycle Route. The Lake Erie Connector is intended primarily as a shortcut that saves convert|244|mi|km|0 between the …   Wikipedia

  • NEMA connector — Twist lock connector redirects here. For the device used in intermodal shipping, see Twistlock. Ungrounded and grounded power plugs …   Wikipedia

  • Hull Shore Drive and Nantasket Avenue — Hull Shore Drive, Nantasket Avenue, Metropolitan Park System of Greater Boston MPS U.S. National Register of Historic Places U.S. Historic district …   Wikipedia

  • Pittsburgh Light Rail — The Pittsburgh Light Rail, commonly known as The T, is a convert|25|mi|km|0|sing=on light rail system in Pittsburgh, Pennsylvania; it functions as a subway in downtown Pittsburgh and largely as an at grade light rail service in the suburbs. The… …   Wikipedia

  • Allegheny River Tunnel — is a tunnel under construction in the city of Pittsburgh, Pennsylvania. The tunnel is part of the North Shore Connector Project which consists of boring twin tunnels under the Allegheny River to connect the North Shore with the city. Light Rail… …   Wikipedia

  • Port Authority of Allegheny County — Not to be confused with Port of Pittsburgh Commission. For other uses, see PAT (disambiguation). Port Authority of Allegheny County …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”