2008 Channel Tunnel fire

2008 Channel Tunnel fire
Location of the 2008 Channel Tunnel fire

The 2008 Channel Tunnel fire occurred on 11 September 2008 in the Channel Tunnel. The incident involved a France-bound Eurotunnel Shuttle train carrying heavy goods vehicles (HGVs) and their drivers.

The fire lasted for sixteen hours and reached temperatures of up to 1000 °C.[1] Of the thirty-two people on board the train, fourteen people suffered minor injuries, including smoke inhalation and were taken to hospital. When the fire was reported, the tunnel was immediately shut to all services except emergency traffic. The undamaged south tunnel was reopened 13 September with a freight train entering the tunnel at Folkestone at 00:08 BST and a limited service provided with trains travelling in turn in alternating directions in the one tunnel. By the end of September, two thirds of the north tunnel had reopened. Full service resumed in February 2009 after repairs costing €60 million.

This fire was the third to close the tunnel since it opened in 1994,[2] the first being the 1996 Channel Tunnel fire and, in August 2006, the tunnel was closed for several hours after fire broke out on a truck loaded onto a HGV Shuttle.

Contents

The fire

The fire was reported on 11 September 2008, at approximately 13:57 UTC[3] (14:57 BST / 15:57 CEST) 11 kilometres (6.8 mi) from the French entrance to the tunnel in the North Tunnel. The blaze spread to other trucks on the train during the evening, destroying six carriages and one locomotive. The fire continued to burn overnight[4] and was reported to have been put out by 06:00 GMT the following day, although fire crews continued to smother minor fires nearby for a further two hours.[5] More than 300 firefighters from both sides of the English Channel helped tackle the blaze,[6] with emergency services from East and West Sussex, London and Essex providing support.

A simple cross-section view of the Channel Tunnel facing towards the UK

Thirty-two people on board the train were led to safety down a separate service tunnel; fourteen people suffered minor injuries, including smoke inhalation, and were taken to hospital. The shuttle was carrying 27 vehicles.[7]

A lorry carrying 100 kg of phenol (carbolic acid), a toxic product used in the pharmaceutical industry, was initially thought to be close to the seat of the fire; however this is discovered to be an error and only 100g was carried.[8] Eyewitness accounts state that two loud bangs, described as explosions, were heard and then thick smoke swept through the carriage. The train came to a grinding halt, and the lights went out. Further eyewitness accounts suggest that the emergency exit was jammed, and one passenger smashed a window with a hammer in order to climb out. The temperature in the tunnel was described as "very hot".[7][9]

About 650 m of tunnel was damaged by the fire, 50% more than during the fire of November, 1996.[10]

Aftermath

Tunnel closure and reopening

As the tunnel was closed, Operation Stack phase 3 was initiated to deal with queuing road freight, closing a 14-mile coast-bound section of the M20 motorway, between junctions 8 and 9 in Kent. Private motorists with Eurotunnel tickets were given vouchers for cross channel ferries. The fire caused the recall of five Eurostar passenger trains en-route at the time, affecting 2,000 passengers.

At midday on the following day, the ‘bi-national status’ of the operation was lifted making it a French incident. Eurotunnel retook control of the infrastructure and its technicians started to carry out a physical inspection to allow operations in the south tunnel to resume.

Eurotunnel initially announced that all services would be suspended until 14 September; however, after inspection found no damage to the south tunnel, empty test shuttles were trialled during the evening of 12 September. A freight train was permitted to enter the tunnel at 00:08 BST on 13 September,[11] and limited Eurostar services resumed at 06:00 BST later that morning, with 18 services in each direction, including a return journey from London to Disneyland Paris.[12] Some passengers arriving at St Pancras Station reported that they had smelt smoke whilst travelling through the tunnel.[13] A limited passenger shuttle service restarted on 14 September with the 06:18 BST from Folkestone.[14] Services were increased when the section of the north tunnel was reopened from Folkestone to the UK crossover on 22 September,[15] and again on 29 September when the tunnel between the crossovers was brought back into service.[16] While the final sixth of the tunnel was being repaired, trains were limited to 100 km/h (62 mph) by the Intergovernmental Commission. Service levels were reduced so that only 90% of Eurostar services, 60% of Eurotunnel passenger vehicle shuttles and 70% of the HGV shuttles were able to run,[10] costing Eurotunnel an estimated £185 million (€200 million) in lost revenue.[17]

Tunnel repair

Repair works are estimated at about €60 million.[17] On 18 October, the investigation authority released the damaged section of tunnel back to Eurotunnel[18] who then assessed the tunnel lining and replaced over one thousand bolts holding the concrete lining. The damaged concrete was then removed with high pressure water jets, damage to the reinforcing steel mesh repaired and a new concrete lining applied by a shotcreting process. This used about 4000 tonnes of new concrete and was completed in early January 2009.[10] During the remainder of January, tunnel equipment was repaired and replaced as necessary, with the installation of overhead line equipment on 28 January.[17] After test running, Eurotunnel reopened on 9 February 2009.[19]

Eurotunnel Response

When the train stopped in the tunnel due to a fire, the procedure was that the smoke is removed by the high powered ventilation before evacuation is allowed. However, when the train came to a halt, people saw the smoke and some panicked. The evacuation procedure is now shown in nine languages in the lorry driver's club car. Eurotunnel are also concerned that it took 75 minutes before the fire services started to tackle the blaze and that the ventilation was on during this time, fanning the fire and increasing the damage.[10][20] After tests in April 2010, Eurotunnel are building four "fire-fighting stations" in the tunnel. When a fire is detected on a train, it continues to the next station, passengers and crew are evacuated into the service tunnel and an automatic system puts the fire out with water mist. These are planned to be operational in 2011.[21]

Investigation

The investigation was led by the French Land Transport Accident Investigation Bureau (Bureau d'Enquêtes sur les Accidents de Transport Terrestre) and supported by the British Rail Accident Investigation Branch. The report was published on 22 November 2010.[22]

See also


References

  1. ^ Rayner, Gordon; Millward, David; Simpson, Aislinn (11 September 2008). "Channel Tunnel closed after freight train fire". The Daily Telegraph (London). http://www.telegraph.co.uk/travel/travelnews/2800485/Channel-Tunnel-closed-after-freight-train-fire.html. Retrieved 2008-09-11. 
  2. ^ "How the 2008 fire changed Channel Tunnel history". KentOnline. 5 May 2009. Archived from the original on 2009-05-28. http://www.kentonline.co.uk/kentonline/news/2009/may/5/the_channel_tunnel_fire_2008.aspx. Retrieved 20 May 2009. 
  3. ^ Robert Wright (10:08AM BST 12 Sep 2008). "Channel tunnel fire causes further cancellations". Financial Times. http://www.ft.com/cms/s/0/ad05c7e6-8062-11dd-99a9-000077b07658.html. Retrieved 2008-09-12. 
  4. ^ Millward, David (11 September 2008). "Channel Tunnel closed after reported fire". The Daily Telegraph (London). http://www.telegraph.co.uk/travel/travelnews/2799349/Channel-Tunnel-closed-after-reported-fire.html. Retrieved 2008-09-11. 
  5. ^ "Tunnel blaze finally out but chaos continues". The Independent (London). 12 September 2008. http://www.independent.co.uk/travel/news-and-advice/tunnel-blaze-still-burning-as-chaos-continues-927409.html. Retrieved 2008-09-12. 
  6. ^ "Fire breaks out in Channel Tunnel". http://www.iht.com/articles/ap/2008/09/11/europe/EU-France-Channel-Tunnel-Fire.php. Retrieved 2008-09-11. 
  7. ^ a b "Channel Tunnel disruption goes on". BBC News. 2008-09-12. http://news.bbc.co.uk/1/hi/uk/7611622.stm. Retrieved 2008-09-12. 
  8. ^ Technical Investigation Report p85
  9. ^ Milmo, Dan (12 September 2008). "Channel tunnel fire worst in service's history". The Guardian (London). http://www.guardian.co.uk/uk/2008/sep/12/transport.channeltunnel1. Retrieved 2008-09-12. 
  10. ^ a b c d Today's Railways UK. February 2009. 
  11. ^ "Channel train services resuming". http://news.trendaz.com/index.shtml?show=news&newsid=1293477&lang=EN. Retrieved 2008-09-11. [dead link]
  12. ^ "Channel train services resuming". BBC News. 2008-09-13. http://news.bbc.co.uk/2/hi/uk_news/7613632.stm. Retrieved 2008-09-12. 
  13. ^ "Channel trains resume after fire". BBC News. 2008-09-13. http://news.bbc.co.uk/1/hi/uk/7613632.stm. Retrieved 2008-09-12. 
  14. ^ "Channel Tunnel Restarts Passenger Shuttles; Increases Capacity". http://www.bloomberg.com/apps/news?pid=20601102&sid=axE4wjVBKNMc&refer=uk. Retrieved 2008-09-14. 
  15. ^ "Increase in traffic through Channel Tunnel follows opening of 17km section of North Tunnel (Eurotunnel)". 21 September 2008. http://www.eurotunnel.com/ukcP3Main/ukcCorporate/ukcMediaCentre/ukcNewsReleases/ukcNews2008/ukcSeptember2008/ukpPr0908Opening17KmSectionNorthTunnel.htm. Retrieved 23 January 2009. 
  16. ^ "Further increase in traffic capacity in the Channel Tunnel (Eurotunnel)". 29 September 2008. http://www.eurotunnel.com/ukcP3Main/ukcCorporate/ukcMediaCentre/ukcNewsReleases/ukcNews2008/ukcSeptember2008/ukpPr0809Opening2ndSection.htm. Retrieved 23 January 2009. 
  17. ^ a b c "Channel Tunnel Update". ITV Local News. 28 January 2009. http://www.itvlocal.com/meridian/news/?void=281337. Retrieved 29 January 2009. 
  18. ^ Eurotunnel (19 January 2009). "Channel Tunnel back to full capacity during night of 9–10 February". http://www.eurotunnel.com/ukcP3Main/ukcCorporate/ukcMediaCentre/ukcNewsReleases/ukcNews2009/ukcJanuary2009/ukpPr0901Channel-Tunnel-Full-Capacity.htm. Retrieved 22 January 2009. 
  19. ^ Eurotunnel (9 February 2009). "Eurotunnel fully open to traffic". http://www.eurotunnel.com/ukcP3Main/ukcCorporate/ukcMediaCentre/ukcNewsReleases/ukcNews2009/ukcFebruary2009/ukpPr0902Eurotunnel-back-to-full-capacity.htm. Retrieved 10 February 2009. 
  20. ^ "Eurotunnel seeks safety changes". Railway Gazette. 23 December 2008. http://www.railwaygazette.com/ur_single/article/2008/12/9225/eurotunnel_seeks_safety_changes.html. Retrieved 29 January 2009. [dead link]
  21. ^ "Eurotunnel on Track". Eurotunnel. April 2010. Archived from the original on July 17, 2011. http://web.archive.org/web/20110717115349/http://www.eurotunnel.com/NR/rdonlyres/E16EF7C1-7D76-423E-B5AD-19ADA92B4493/0/100430ETOnTrackApril2010.pdf. 
  22. ^ "Fire on a freight shuttle train in the channel tunnel". RAIB and BEA-TT. 22 November 2010. http://www.raib.gov.uk/publications/investigation_reports/reports_2010/reportet2010.cfm. 

External links

Coordinates: 50°58′N 1°40′E / 50.97°N 1.66°E / 50.97; 1.66


Wikimedia Foundation. 2010.

Игры ⚽ Нужно решить контрольную?

Look at other dictionaries:

  • Channel Tunnel fire — may refer to one of three fires which have occurred in the Channel Tunnel since its opening in 1994. All were caused by lorries carried on the heavy goods vehicle trains. 1996 Channel Tunnel fire, a fire which burned for over seven hours on 18… …   Wikipedia

  • 1996 Channel Tunnel fire — See also: 2008 Channel Tunnel fire Location of the 1996 Channel Tunnel fire The Channel Tunnel fire of 18 November 1996 occurred on a train carrying heavy goods vehicles (HGVs) and their drivers through the Channel Tunnel from France to Great… …   Wikipedia

  • Channel Tunnel — Map of the Channel Tunnel Overview Location English Channel (Strait of Dover) Coordinates Folkestone …   Wikipedia

  • Channel Tunnel Safety Authority — The Channel Tunnel Safety Authority is an international regulatory body responsible for safety in the Channel Tunnel.[1] Map of the 2008 fire in the channel tunnel The CTSA was established by the Treaty of Canterbury. It advises the… …   Wikipedia

  • Tunnel — This article is about underground passages. For other uses, see Tunnel (disambiguation). Underground tunnel for heatpipes between Rigshospitalet and Amagerværket in Denmark …   Wikipedia

  • 2008 Chatsworth train collision — This article is about the 2008 Metrolink train collision in Los Angeles. For the 1887 train collision at Great Chatsworth, Illinois, see 1887 Great Chatsworth train wreck. Chatsworth train collision Resc …   Wikipedia

  • 2008 South Ossetia war — Part of Georgian–Ossetian conflict and Georgian–Abkhazian conflict Locat …   Wikipedia

  • New York City Fire Department — Fire Department of New York Motto:  New …   Wikipedia

  • Japan–Korea Undersea Tunnel — The proposed routes for the Japan–Korea undersea tunnel. The Japan–Korea Undersea Tunnel (also: Korea–Japan Undersea Tunnel, JPN–KOR Tunnel, 한일 해저 터널, and 日韓トンネル) is a proposed tunnel project to connect Japan with Republic of Korea (South Korea)… …   Wikipedia

  • Memorial Tunnel — The Memorial Tunnel is a 2,802 feet (854 m) two lane vehicular tunnel that formerly carried the West Virginia Turnpike through/under Paint Creek Mountain in Standard, West Virginia in Kanawha County.[1] Closed to interstate traffic since… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”