Maidstone East railway station

Maidstone East railway station
Maidstone East National Rail
Maidstone East Station 04.JPG
Location
Place Maidstone
Local authority Maidstone
Operations
Station code MDE
Managed by Southeastern
Number of platforms 3
Live arrivals/departures and station information
from National Rail Enquiries
Annual rail passenger usage
2004/05 *   0.830 million
2005/06 * increase 0.870 million
2006/07 * increase 1.877 million
2007/08 * increase 1.978 million
2008/09 * increase 2.114 million
2009/10 * decrease 1.890 million
History
1874 Opened as "Maidstone"
1899 Renamed (Maidstone East)
1939 Electrified
1993 Derailment
National Rail - UK railway stations
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
* Annual passenger usage based on sales of tickets in stated financial year(s) which end or originate at Maidstone East from Office of Rail Regulation statistics. Please note: methodology may vary year on year.
Portal icon UK Railways portal
Local train to Ashford in 1961

Maidstone East railway station is one of three stations in the central area of Maidstone, Kent, but currently the only one with a regular direct service to London. The station is on the Maidstone East Line, 40 miles (64 km) south-east of London Victoria (37 miles (60 km) south-east of London Bridge), and is served by trains operated by Southeastern.

Contents

Layout

The station is to the east of the River Medway. The approach from the west is via a high level truss bridge over the river and a later girder bridge over the A229. Immediately east of the station is the portal to the 100 yards (91 m) Week Street tunnel.

The booking office, open for most of the operational day, is located at street level on Station Road, above the tunnel portal, with other offices on up platform 1 as well as a coffee shop. There are also offices on Platform 2.

There is a PERTIS self service 'Permit to Travel' ticket machine located on the ramp which leads to the down side platforms (2/3) but that on the up side was removed some years ago when the current-generation passenger-operated self-service ticket machine was installed.

The station has three platforms: 1 and 2 are through platforms capable of handling trains of up to 8 cars. Platform three is a bay platform on the north (down line) side. Ramps lead down to the platforms on each side. The station formerly had a goods yard on its north side. Part is the site of a Royal Mail sorting office and the remainder a car park for station users. A short siding from the down line to the west of platforms 2 and 3 is a remnant of tracks into the yard. A smaller goods yard also existed on the south side; this is now a car park. A disused face to platform 1 shows the alignment of a former bay platform.

A third track runs as a passing track through the station between the up and down lines.

A pedestrian walkway on the railway bridge provides a route to the Medway Valley Line's Maidstone Barracks station on the west of the river. Maidstone's third station, Maidstone West, is 0.5 miles (800 m) south of Maidstone Barracks.

History

Maidstone East was opened as Maidstone by the London, Chatham and Dover Railway (LCDR) on 1 June 1874 as the terminus of the line from Otford. On 1 July 1884, the line was extended eastwards to Ashford. In 1899, following the merger of the LCDR with the South Eastern Railway (SER) which operated the Medway Valley line, the station was given its current name to distinguish it from the SER's identically named station which was renamed Maidstone West.

Following the grouping of mainline rail companies into regional railways in 1923, the Southern Railway undertook electrification as far as Maidstone East in 1939. Electrification to Ashford was carried out in 1961. Goods services at the station were discontinued in 1965.

Accidents

The station has been the site of two accidents involving freight trains.

In the first, on 17 July 1967, a slow-moving westbound train passed a signal at danger and ran into the rear of a stationary passenger train at the up platform causing damage to the both trains but only interrupting services for a few hours.[1]

The second, on 6 September 1993, was more significant. At 02:02, a freight derailment occurred. A train, comprising 15 goods wagons was travelling from Dover to Willesden hauled by a Class 47 locomotive (No 47288), when, due to excessive speed, the locomotive's rear bogie derailed in the tunnel approaching Maidstone East. The locomotive ended up on its side on the track. Several wagons left the track, running into signals, platforms and buildings, and spilling their load of 900 tons of steel cable. The driver subsequently failed a breathalyser test. The station remained closed for only a short period as a result of the accident.[2]

Development

There have been plans to redevelop the station for a number of years. In 2005 Network Rail announced that they were in talks with the John Lewis Partnership who intended to build a large Waitrose supermarket on the site. However, in November of that year, the developer that had been working on the deal pulled out taking John Lewis with them.[3] The following year a new redevelopment in conjunction with supermarket chain Asda was proposed. This development included a 50,000 sq ft (5,000 m2) store, hotel, 100 homes and parking for 515 cars.[4] In 2007 it was reported that Asda were getting cold feet over the plans, although Asda stressed that talks were still ongoing,[5] but in 2009 it was confirmed that Asda had withdrawn their interest due to their development of a site at the nearby St Peters' Street complex instead.[6]

Services

The typical off-peak service from the station is two trains per hour to Ashford International and two trains per hour to London Victoria.

There is also a peak hour service via Thameslink across London, serving City Thameslink, Farringdon and St Pancras International before travelling onto Bedford.

After the completion of the Thameslink Programme in 2015 a 2tph service from Maidstone East to Royston is proposed.[7]

Preceding station National Rail National Rail Following station
Barming   Southeastern
Maidstone East Line
  Bearsted

Gallery

See also

References

External links

Coordinates: 51°16′41″N 0°31′16″E / 51.278°N 0.521°E / 51.278; 0.521


Wikimedia Foundation. 2010.

Игры ⚽ Поможем сделать НИР

Look at other dictionaries:

  • Maidstone West railway station — Maidstone West Location Place …   Wikipedia

  • Maidstone Barracks railway station — Maidstone Barracks Location Place …   Wikipedia

  • East Farleigh railway station — Infobox UK station name = East Farleigh code = EFL caption = East Farleigh railway station in 1977 manager = Southeastern locale = East Farleigh borough = Maidstone lowusage0405 = 18,091 lowusage0506 = 17,527 lowusage0607 = 21,782 platforms = 2… …   Wikipedia

  • East Malling railway station — Infobox UK station name = East Malling code = EML manager = Southeastern locale = East Malling borough = Tonbridge and Malling lowusage0405 = 81,576 lowusage0506 = 97,692 lowusage0607 = 99,324 platforms = 2 start = May 1913East Malling railway… …   Wikipedia

  • Maidstone East Line — Swanley to Ashford (via Maidstone East) Line, shown with other railway lines in Kent. Overview Type Suburban rail, Heavy rail …   Wikipedia

  • Canterbury West railway station — Infobox UK station name = Canterbury West code = CBW caption = View of Main Platform from Ramsgate end manager = Southeastern locale = Canterbury borough = Canterbury usage0405 = 2.015 usage0506 = 2.172 usage0607 = 1.640 platforms = 2 start = 6… …   Wikipedia

  • Otford railway station — For the station in Australia, see Otford railway station, New South Wales. Otford …   Wikipedia

  • Maidstone Museum & Art Gallery — The Museum viewed from Fremlin Walk. Established 1858 Location St Faiths Street, Maidstone …   Wikipedia

  • Paddock Wood railway station — Paddock Wood Location Place …   Wikipedia

  • New Hythe railway station — New Hythe Location Place …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”